|
WELCOME TO THE
HUNTERDON COUNTY
DEPARTMENT OF HEALTH
Environmental Health Services
2018 SEPTIC DESIGN APPROVALS
View: 2021 | 2020 | 2019 | 2018 |
The Reference Number is the Township (using the Geo-Code) and the Block/Lot Number
For Example: Alexandria Township Block 1 , Lot 1. Would be 01-1/1 |
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
01-21.04/16.13 |
01/16/2018 |
KURT HOFFMAN |
ALTERATION |
01-21/3.02 |
01/26/2018 |
TOLL BROTHERS |
REDESIGN |
01-9/8 |
02/26/2018 |
BAYER RISSE |
ALTERATION |
01-14/9 |
02/02/2018 |
PARKER |
ALTERATION |
01-21/13 |
02/13/2018 |
ART FRANKENFIELD |
REPAIR |
01-17/17 |
02/21/2018 |
CASTLE SEPTIC |
REPAIR |
01-9/19 |
03/16/2018 |
DOUGLAS E. FINE |
ALTERATION |
01-14/5 |
03/12/2018 |
DOUG FINE |
ALTERATION |
01-21.04/16.02 |
03/02/2018 |
KURT HOFFMAN |
ALTERATION |
01-9/21 |
04/19/2018 |
DOUG FINE |
ALTERATION |
01-15/10-1 |
04/09/2018 |
RBZ ENTERPRISES, INC. |
NEW |
01-15/10-3 |
04/09/2018 |
RBZ ENTERPRISES, INC. |
NEW |
01-15/10-4 |
04/09/2018 |
RBZ ENTERPRISES, INC. |
NEW |
01-12/17 |
04/09/2018 |
KEITH KONNECKE |
REPAIR |
01-21/14 |
04/10/2018 |
CORY PAIEDA |
REPAIR |
01-11.02/15.12 |
04/23/2018 |
HERCULES SEPTIC |
REPAIR |
01-4/27 |
05/08/2018 |
STEPHEN PARKER |
ALTERATION |
01-9/1.05 |
05/30/2018 |
CASTLE SEPTIC |
REPAIR |
01-23/5.04 |
05/14/2018 |
CASTLE SEPTIC |
REPAIR |
01-7/16.02 |
05/18/2018 |
DAN HOLZLI |
REPAIR |
01-17/37.03 |
05/29/2018 |
BAYER RISSE |
ALTERATION |
01-8/28.01 |
06/29/2018 |
CASTLE SEPTIC |
HOME INSPECTION REPORTS |
01-16/11 |
06/11/2018 |
KURT HOFFMAN |
ALTERATION |
01-14.01/1 |
06/01/2018 |
BAYER RISSE |
ALTERATION |
01-8/28.01 |
06/29/2018 |
KURT HOFFMAN |
ALTERATION |
01-8/34 |
06/13/2018 |
RICK BEAVERS |
REPAIR |
01-14/10 |
06/26/2018 |
CASTLE SEPTIC |
REPAIR |
01-18/18 |
06/28/2018 |
KURT HOFFMAN |
REPAIR |
01-3/40 |
07/18/2018 |
E & LP |
NEW |
01-21/41.31 |
07/24/2018 |
PARKER ENGINEERING |
ALTERATION |
01-18/25 |
07/12/2018 |
KURT HOFFMAN |
ALTERATION |
01-10/63.06 |
07/03/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
01-14/20.02 |
07/06/2018 |
HUNTERDON HORIZONS |
REPAIR |
01-6/11.30 |
07/09/2018 |
BEACHSTONE |
REPAIR |
01-21/3.10 |
07/11/2018 |
CASTLE SEPTIC |
REPAIR |
01-11/15.02 |
07/12/2018 |
D&V CONSTRUCTION |
REPAIR |
01-10/48.05 |
07/17/2018 |
D&V CONSTRUCTION |
REPAIR |
01-8/32 |
07/24/2018 |
KURT HOFFMAN |
ALTERATION |
01-14/14 |
08/20/2018 |
STEVE PARKER |
ALTERATION |
01-11/15.04 |
08/08/2018 |
BAYER RISSE |
ALTERATION |
01-17.01/23 |
08/16/2018 |
RIVER VALLEY SEPTIC |
REPAIR |
01-18/36 |
08/24/2018 |
CASTLE SEPTIC |
REPAIR |
01-5.01/22 |
09/26/2018 |
BAYER RISSE |
ALTERATION |
01-4/2 |
09/11/2018 |
KURT HOFFMAN |
ALTERATION |
01-13/3.05 |
09/17/2018 |
CASTLE SEPTIC |
REPAIR |
01-7/50 |
09/14/2018 |
BOB RUTAN |
REPAIR |
01-12/1.10 |
10/23/2018 |
KURT HOFFMAN |
ALTERATION |
01-19/8.01 |
10/04/2018 |
HERCULES |
REPAIR |
01-6/11.26 |
10/16/2018 |
MICHAEL MESSICK |
REPAIR |
01-7/22 |
10/30/2018 |
CASTLE SEPTIC |
REPAIR |
01-11/10.01 |
11/9/2018 |
E & LP |
ALTERATION |
01-7/15 |
11/8/2018 |
PARKER |
ALTERATION |
01-20.02/1 |
11/26/2018 |
MERIDIAN |
REPAIR |
01-7/31 |
11/27/2018 |
BAYRE RISSE |
ALTERATION |
01-5/15.04 |
11/27/2018 |
CASTLE SEPTIC |
REPAIR |
01-21.04/16.09 |
12/5/2018 |
CHARLES MATARAZZO |
REPAIR |
01-14/20.01 |
12/14/2018 |
LUSTER EXCAVATING |
REPAIR |
01-9/31 |
12/19/2018 |
HOOPER EXCAVATING |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
02-35/6.02 |
01/16/2018 |
WAYNE SCHMIED |
REPAIR |
02-35/5 |
04/02/2018 |
KURT HOFFMAN |
ALTERATION |
02-36/7.12 |
04/06/2018 |
911 SEPTIC PUMPING & REPAIR |
REPAIR |
02-39/19.03 |
04/13/2018 |
BAYER RISSE |
ALTERATION |
02-48/51.03 |
04/18/2018 |
CHARLES W. BLAUTH |
REPAIR |
02-33/37 |
05/17/2018 |
ERICA BUSCH |
ALTERATION |
02-8/12.14 |
05/03/2018 |
TRICOUNTY SEPTIC |
REPAIR |
02-37/9.23 |
05/04/2018 |
CASTLE SEPTIC |
REPAIR |
02-35/6.11 |
05/07/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
02-8/9.08 |
05/16/2018 |
BAYER RISSE |
ALTERATION |
02-8/26 |
06/04/2018 |
MATARAZZO EXCAVATING |
REPAIR |
02-34.02/11 |
06/04/2018 |
NJ SEPTEIC MANAGEMENT |
REPAIR |
02-31/10.05 |
06/27/2018 |
HUNTERDON EXCAVATING |
REPAIR |
02-6/40 |
06/27/2018 |
THE PUMPER, LLC |
REPAIR |
02-36/29 |
07/17/2018 |
K & H EXCAVATING |
REPAIR |
02-8/30 |
07/17/2018 |
K & H EXCAVATING |
REPAIR |
02-34/29.03 |
07/24/2018 |
KURT HOFFMAN |
ALTERATION |
02-37/9.10 |
08/15/2018 |
KURT HOFFMAN |
ALTERATION |
02-6/37 |
08/13/2018 |
GEORGE GLOEDE JR |
ALTERATION |
02-5/39.02 |
08/07/2018 |
HERCULES SEPTIC |
REPAIR |
02-48/26.47 |
08/16/2018 |
BEDMINSTER EXCAVATING |
REPAIR |
02-5/79 |
08/13/2018 |
CASTLE SEPTIC |
REPAIR |
02-32/6 |
09/05/2018 |
KURT HOFFMAN |
ALTERATION |
02-8/8.10 |
09/04/2018 |
GARDEN STATE SEPTIC |
REPAIR |
02-40/1.11 |
09/18/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
02-3/11 |
09/20/2018 |
GARDEN STATE SEPTIC |
REPAIR |
02-8/19.10 |
09/20/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
02-3/8.01 |
09/20/2018 |
SALVATORI'S P & H |
REPAIR |
02-37/37.13 |
10/02/2018 |
ROBERT RUTAN |
REPAIR |
02-48/77 |
10/16/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
02-48/26.08 |
10/17/2018 |
MARK HENDRICKSON |
REPAIR |
02-40/3 |
10/16/2018 |
CASTLE SEPTIC |
REPAIR |
02-43/49.04 |
11/27/2018 |
PLATINUMĀ BUILDERS |
REPAIR |
02-36.01/1 |
11/27/2018 |
ASBURY CONSULTING ENGINEERS |
ALTERATION |
02-5/2.20 |
11/29/2018 |
KURT HOFFMAN |
ALTERATION |
02-34/11.01 |
12/5/2018 |
D & V |
REPAIR |
02-43/36.01 |
12/17/2018 |
BAYER RISSE |
ALTERATION |
02-48/77 |
12/19/2018 |
DAN COLEMAN |
REPAIR |
- |
- |
- |
- |
TO TOP
BLOOMSBURY BOROUGH - 03 |
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
03-14/12 |
01/03/2018 |
E & LP |
ALTERATION |
03-8/1 |
01/16/2018 |
WILLEVER EXCAVATING |
REPAIR |
03-17/1 |
01/30/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
03-20/7 |
03/29/2018 |
FERRIERO ENGINEERING |
ALTERATION |
03-20/17 |
06/27/2018 |
KURT HOFFMAN |
ALTERATION |
03-19/1.02 |
07/18/2018 |
BIGGS ENGINEERING |
ALTERATION |
03-17/29 |
07/02/2018 |
KURT HOFFMAN |
ALTERATION |
03-23/1.02 |
08/03/2018 |
DOUG FINE |
NEW |
03-26/43 |
08/13/2018 |
JOHN KEARNEY |
ALTERATION |
03-13/3 |
12/28/2018 |
PARKER ENGINEERING |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
04-31/34 |
01/25/2018 |
BEAVERS LANDSCAPING |
REPAIR |
04-30/2 |
02/13/2018 |
KURT HOFFMAN |
ALTERATION |
04-2.01/7 |
04/27/2018 |
MATARAZZO |
REPAIR |
04-18/25 |
05/15/2018 |
KURT HOFFMAN |
NEW |
04-18/6 |
06/06/2018 |
E & LP |
ALTERATION |
04-2/2.01 |
07/30/2018 |
E & LP |
NEW |
04-5/1.10 |
07/06/2018 |
BOB RUTAN |
REPAIR |
04-4.01/12 |
07/09/2018 |
BEACHSTONE |
REPAIR |
04-4.01/13 |
09/26/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
04-20/10 |
10/26/2018 |
CHARLES F. TIEDEMAN |
ALTERATION |
04-31/4 |
10/04/2018 |
GREGORY YANNACCONE |
ALTERATION |
04-31/29 |
10/03/2018 |
CAPRICORN |
ALTERATION |
04-22/2 |
10/31/2018 |
R. BROWN CONSTRUCTION |
REPAIR |
04-20/28 |
10/22/2018 |
HUELSEBUSCH/TOBY BARKMAN |
REPAIR |
04-31/1 |
11/13/2018 |
REZA HESHEMI |
ALTERATION |
04-2/3.01 |
12/11/2018 |
E & LP |
NEW |
04-2/3.02 |
12/17/2018 |
E & LP |
NEW |
04-2/3.03 |
12/11/2018 |
E & LP |
NEW |
04-2/3.05 |
12/17/2018 |
E & LP |
NEW |
04-2/3.04 |
12/17/2018 |
E & LP |
NEW |
04-2/3.06 |
12/17/2018 |
E & LP |
NEW |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
06-46/47 |
01/11/2018 |
DOUG FINE |
ALTERATION |
06-3/39 |
01/26/2018 |
CHARLIE TIEDEMANN |
ALTERATION |
06-34.06/16.02 |
01/04/2018 |
PERFECTION |
REPAIR |
06-92/6 |
01/03/2018 |
CASTLE SEPTIC |
REPAIR |
06-88.01/1 |
01/08/2018 |
|
REPAIR |
06-43/8 |
01/25/2018 |
ERICA BUSCH |
ALTERATION |
06-90/2.15 |
02/14/2018 |
RBZ ENTERPRISES |
REDESIGN |
06-41/1 |
02/23/2018 |
BIGGS ENGINEERING |
ALTERATION |
06-91/6 |
02/08/2018 |
KURT HOFFMAN |
ALTERATION |
06-13.02/22 |
02/08/2018 |
KURT HOFFMAN |
ALTERATION |
06-46/15 |
03/15/2018 |
BIGGS |
ALTERATION |
06-89.01/12 |
03/15/2018 |
KURT HOFFMAN |
ALTERATION |
06-88/18 |
03/28/2018 |
BAYER RISSE |
ALTERATION |
06-82/39.08 |
03/26/2018 |
JJ&B SERVICES |
REPAIR |
06-43/5 |
04/04/2018 |
BIGGS ENGINEERING |
REDESIGN |
06-82.18/49.07 |
04/03/2018 |
CASTLE SEPTIC |
REPAIR |
06-87/5.03 |
04/19/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
06-16/51.07 |
04/10/2018 |
CASTLE SEPTIC |
REPAIR |
06-30/14.01 |
04/12/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-33/9.08 |
04/19/2018 |
TRI COUNTY SEPTIC |
REPAIR |
06-15/5.13 |
04/27/2018 |
BEACHSTONE SEPTIC |
REPAIR |
06-13.02/8 |
04/27/2018 |
BAYER RISSE |
ALTERATION |
06-82.19/17 |
04/27/2018 |
KEN LANGE |
REPAIR |
06-1/26.01 |
05/04/2018 |
KURT HOFFMAN ENGINEERING |
REPAIR |
06-28/1.01 |
05/04/2018 |
TRIPLE K |
REPAIR |
06-82/15 |
05/07/2018 |
BEACHSTONE |
REPAIR |
06-82.01/12 |
05/10/2018 |
CASTLE SEPTIC |
REPAIR |
06-91.01/22 |
05/15/2018 |
KURT HOFFMAN |
ALTERATION |
06-35/13 |
05/14/2018 |
D & V |
REPAIR |
06-60.03/85.26 |
05/16/2018 |
BOB RUTAN |
REPAIR |
06-80/5 |
05/16/2018 |
ERICA BUSCH |
ALTERATION |
06-46/52 |
05/16/2018 |
TRI COUNTY SEPTIC |
REPAIR |
06-3/9.09 |
05/23/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
06-46/55 |
05/29/2018 |
ROBERT RUTAN |
REPAIR |
06-13/24.29 |
05/29/2018 |
JJ & B SERVICES |
REPAIR |
06-4.03/7 |
05/31/2018 |
RICHARD PFAUTH |
REPAIR |
06-3/36 |
06/22/2018 |
G GLOEDE |
ALTERATION |
06-82.14/23 |
06/04/2018 |
D & VĀ CONSTRUCTION |
REPAIR |
06-88/17.09 |
06/28/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-13/12.04 |
06/19/2018 |
NEW VISION CONTRACTING |
REPAIR |
06-1.04/26.21 |
06/22/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-91.03/3 |
06/26/2018 |
D&V CONSTRUCTION |
REPAIR |
06-83/3.01 |
07/30/2018 |
DOUG FINE |
ALTERATION |
06-25/4 |
07/13/2018 |
JOHN KEARNEY |
ALTERATION |
06-46/58 |
07/02/2018 |
D & V |
REPAIR |
06-16/57 |
07/13/2018 |
DOUGLAS FINE |
ALTERATION |
06-63/7.02 |
07/03/2018 |
GARDEN STATE SEPTIC |
REPAIR |
06-63/7.07 |
07/02/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
06-89.01/9 |
07/11/2018 |
CASTLE SEPTIC |
REPAIR |
06-28.01/13.04 |
07/13/2018 |
RICK BEAVERS |
REPAIR |
06-29/2.02 |
07/18/2018 |
ERICA BUSCH |
ALTERATION |
06-79.02/25 |
07/17/2018 |
RICHARD METZ |
REPAIR |
06-91.04/31 |
07/17/2018 |
TOBY BARKMAN |
REPAIR |
06-34/10.19 |
07/19/2018 |
EARTHCARE |
REPAIR |
06-3/14.08 |
07/19/2018 |
CHOICE LANDSCAPE |
REPAIR |
06-20/7.09 |
07/26/2018 |
BOB RUTAN |
REPAIR |
06-82.06/48 |
07/26/2018 |
TRI COUNTY SEPTIC LLC |
REPAIR |
06-3/2 |
08/07/2018 |
ERICA BUSCH |
ALTERATION |
06-13.02/4 |
08/09/2018 |
DOUGLAS E. FINE, P.E. |
ALTERATION |
06-82.06/50 |
08/16/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
06-4/20.03 |
08/09/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
06-60.03/85.21 |
08/23/2018 |
HUNTERDON EXCAVATING |
REPAIR |
06-91.01/20 |
08/23/2018 |
CASTLE SEPTIC |
REPAIR |
06-28/9.03 |
09/06/2018 |
A & B HARTRUM |
REPAIR |
06-29/2.01 |
09/12/2018 |
BOHREN & BOHREN |
NEW |
06-46.01/19 |
09/04/2018 |
BOB RUTAN |
REPAIR |
06-91/5 |
09/07/2018 |
CASTLE SEPTIC |
REPAIR |
06-30/14.01 |
09/18/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-89/10.08 |
09/25/2018 |
TRI COUNTY SEPTIC |
REPAIR |
06-36/8.05 |
09/26/2018 |
D&V CONSTRUCTION |
REPAIR |
06-12/18.21 |
10/31/2018 |
TRI-COUNTY |
REPAIR |
06-91/4 |
10/22/2018 |
KURT HOFFMAN |
ALTERATION |
06-4/1 |
10/02/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
06-87/21 |
10/03/2018 |
ERICA BUSCH |
ALTERATION |
06-3/14.06 |
10/01/2018 |
KURT HOFFMAN |
ALTERATION |
06-34/6.04 |
10/09/2018 |
WAYNE INGRAM |
ALTERATION |
06-13/24.30 |
10/04/2018 |
JOHN MARTIN |
REPAIR |
06-46.01/12 |
10/03/2018 |
TRIPLE K EXCAVATING |
REPAIR |
06-34.06/16.12 |
10/17/2018 |
TRI-COUNTY |
REPAIR |
06-80/20 |
10/22/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
06-4.06/1 |
10/29/2018 |
JEMCO EXCAVATING LLC |
REPAIR |
06-91/4 |
10/31/2018 |
KURT HOFFMAN |
REDESIGN |
06-60.03/26.04 |
11/1/2018 |
KURT HOFFMAN |
ALTERATION |
06-80/10 |
11/14/2018 |
HOFFMAN |
ALTERATION |
06-12/18.27 |
11/2/2018 |
KURT HOFFMAN |
ALTERATION |
06-4/20.16 |
11/2/2018 |
RUTAN |
REPAIR |
06-30/6 |
11/26/2018 |
CHRIS BARTLEY |
REPAIR |
06-60.03/85.14 |
11/8/2018 |
DEL VAL SEPTIC |
REPAIR |
06-88/17.64 |
11/8/2018 |
D & V |
REPAIR |
06-87/16.01 |
11/8/2018 |
CASTLE SEPTIC |
REPAIR |
06-89/15 |
11/19/2018 |
JJ & B DOUG FINE |
REPAIR |
06-90/1 |
11/19/2018 |
JK HOFFMAN |
REPAIR |
06-68/12 |
12/10/2018 |
BAYER RISSE |
ALTERATION |
06-3.01/6 |
12/24/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
07-26/24 |
01/05/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
07-4/6.01 |
01/17/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
07-2/3 |
01/09/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
07-25/54 |
02/15/2018 |
DOUGLAS FINE |
NEW |
07-55/3.02 |
02/22/2018 |
RICHARD METZ |
REPAIR |
07-41/7 |
03/08/2018 |
KURT HOFFMAN |
ALTERATION |
07-14/26.10 |
03/08/2018 |
PARKER |
ALTERATION |
07-45/3 |
03/20/2018 |
DOUG FINE |
NEW |
07-44/19 |
03/14/2018 |
FREY ENGINEERING |
ALTERATION |
07-21/12.02 |
03/29/2018 |
BAYER RISSE |
REDESIGN |
07-19/8.03 |
03/28/2018 |
HERCULES |
REPAIR |
07-30/19.01 |
04/20/2018 |
BOHREN & BOHREN |
ALTERATION |
07-55/2.05 |
04/12/2018 |
ROBERT RUTAN |
REPAIR |
07-41/9 |
04/18/2018 |
BAYER RISSE |
ALTERATION |
07-31/7 |
05/08/2018 |
G BARKLEY ENGINEERING |
ALTERATION |
07-42/3.01 |
05/31/2018 |
ASBURY CONSULTING ENGINEERS |
ALTERATION |
07-51/11.01 |
05/01/2018 |
BAYER RISSE |
ALTERATION |
07-26/17.03 |
05/09/2018 |
BAYER RISSE |
ALTERATION |
07-7/9 |
05/14/2018 |
RICK BEAVERS |
REPAIR |
07-38/15 |
06/25/2018 |
BOHREN & BOHREN |
ALTERATION |
07-31/6.18 |
06/06/2018 |
RICK BEAVERS |
REPAIR |
07-59/2.05 |
08/02/2018 |
RICHARD E. YARD |
REPAIR |
07-43/11.01 |
08/02/2018 |
RICHARD E YARD |
REPAIR |
07-51/11.15 |
08/02/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
07-14/26.05 |
08/06/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
07-31/6.06 |
08/06/2018 |
BAYER-RISSE |
ALTERATION |
07-34/25 |
08/08/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
07-26.01/6 |
08/09/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
07-19/11.01 |
08/09/2018 |
JOHN MARTIN |
REPAIR |
07-43/15.01 |
08/28/2018 |
JOHN P MARTIN |
REPAIR |
07-60/5 |
08/30/2018 |
BAYER RISSE |
REDESIGN |
07-11/7 |
09/12/2018 |
KURT HOFFMAN |
ALTERATION |
07-3/31 |
09/12/2018 |
E & LP |
ALTERATION |
07-27/3 |
09/13/2018 |
DOUG FINE |
ALTERATION |
07-12/26 |
09/04/2018 |
ASBURY CONSULTING ENGINEERS |
ALTERATION |
07-60/12 |
09/04/2018 |
BAYER-RISSE ENGINEERING |
REDESIGN |
07-19/7.04 |
09/06/2018 |
BAYER RISSE |
ALTERATION |
07-27/38.01 |
10/10/2018 |
BAYER RISSE |
ALTERATION |
07-22/26 |
10/10/2018 |
BAYER RISSE |
ALTERATION |
07-39/4.01 |
10/10/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
07-60/11.06 |
10/04/2018 |
RICHARD YARD |
REPAIR |
07-60/5.01 |
10/10/2018 |
MICHAEL MESSNICK |
REPAIR |
07-60/14.02 |
10/22/2018 |
BEACHSTONE |
REPAIR |
07-41/8 |
10/30/2018 |
JOHN MARTIN |
REPAIR |
07-20/2.01 |
11/7/2018 |
D & V |
REPAIR |
07-56/7 |
11/27/2018 |
BAYER RISSE |
ALTERATION |
07-26.01/39 |
12/14/2018 |
BAYER-RISSE ENGINEERING |
NEW |
07-27/35.03 |
12/5/2018 |
KURT HOFFMAN |
ALTERATION |
07-38/5 |
12/4/2018 |
ROBERT RUTAN |
REPAIR |
07-13/21.02 |
12/20/2018 |
JOHN MARTIN |
REPAIR |
07-20/6.01 |
12/19/2018 |
JOHN MARTIN |
REPAIR |
07-58/8.06 |
12/24/2018 |
RICK BEAVERS |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
08-8/10.09 |
01/25/2018 |
GOLDENBAUM BAILL |
NEW |
08-22/4 |
01/04/2018 |
CAPRICORN ENGINEERING |
ALTERATION |
08-33/14 |
01/05/2018 |
DOUG FINE |
ALTERATION |
08-2/2.01 |
01/16/2018 |
KURT HOFFMAN |
ALTERATION |
08-17/21 |
01/17/2018 |
DELLAVALLE EXCAVATION |
REPAIR |
08-17/14 |
02/05/2018 |
E & LP |
NEW |
08-15.01/2 |
02/06/2018 |
H.A. FERNOT |
REPAIR |
08-27/1.03 |
03/26/2018 |
DOUG FINE |
ALTERATION |
08-20/17.05 |
03/08/2018 |
BEAVERS LANDSCAPE |
REPAIR |
08-6.01/22 |
03/20/2018 |
HUNTERDON HORIZONS |
REPAIR |
08-33/1.05 |
04/20/2018 |
HOUSE TESTERS, INC |
HOME INSPECTION REPORTS |
08-33/1.05 |
04/20/2018 |
BAYERĀ RISSE |
ALTERATION |
08-6/27.05 |
04/17/2018 |
LAWSON EXCAVATING |
REPAIR |
08-2/10.01 |
04/23/2018 |
CASTLE SEPTIC |
REPAIR |
08-30/6.01 |
05/25/2018 |
BAYER RISSE |
ALTERATION |
08-38/29 |
05/29/2018 |
DOUGLAS FINE |
ALTERATION |
08-40/52 |
05/03/2018 |
FRANC ENVIRONMENTAL |
REPAIR |
08-17/35.15 |
05/04/2018 |
NJ SEPTIC MANAGEMENT GROUP |
REPAIR |
08-27/33.01 |
05/10/2018 |
SF LUTZKY |
REPAIR |
08-6/12.01 |
05/11/2018 |
CSM SERVICES |
REPAIR |
08-18/21.01 |
05/21/2018 |
D & V |
REPAIR |
08-26/8 |
06/29/2018 |
STEVE PARKER |
ALTERATION |
08-25/18 |
06/18/2018 |
DOUG FINE |
ALTERATION |
08-21/15.07 |
06/18/2018 |
BAYER RISSE |
ALTERATION |
08-16/4 |
07/16/2018 |
PARKER |
ALTERATION |
08-23/1.11 |
07/03/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
08-20/22.02 |
07/10/2018 |
MICHAEL J. MESSICK |
REPAIR |
08-20/6.02 |
07/19/2018 |
CASTLE |
REPAIR |
08-16.01/28.01 |
07/26/2018 |
JOHN P. MARTIN EXCAVATING |
REPAIR |
08-38/28.03 |
08/01/2018 |
PRINCETON JUNCTION |
ALTERATION |
08-14/18 |
08/01/2018 |
BAYER RISSE |
ALTERATION |
08-40/3 |
08/30/2018 |
DOUG FINE |
ALTERATION |
08-32/4.03 |
09/07/2018 |
E&LP |
NEW |
08-25/20 |
09/11/2018 |
KURT HOFFMAN |
ALTERATION |
08-14.01/23 |
09/06/2018 |
LUSTER EXCAVATING |
REPAIR |
08-17/31 |
09/11/2018 |
TRI COUNTY |
REPAIR |
08-20/2.01 |
09/20/2018 |
CASTLE SEPTIC |
REPAIR |
08-14.01/21 |
09/26/2018 |
TRI-COUNTY |
REPAIR |
08-38/28.01 |
10/11/2018 |
PRINCETON JUNCTION ENGINEERING |
ALTERATION |
08-40/32 |
10/31/2018 |
E & LP |
ALTERATION |
08-4/5.01 |
10/10/2018 |
BAYER RISSE |
ALTERATION |
08-6/2 |
10/02/2018 |
CASTLE SEPTIC |
REPAIR |
08-40.02/12.01 |
11/1/2018 |
BOHREN & BOHREN |
ALTERATION |
08-30/6.03 |
11/26/2018 |
CASTLE SEPTIC |
REPAIR |
08-40.01/5.05 |
11/29/2018 |
RICK BEAVERS |
REPAIR |
08-17/35.14 |
12/10/2018 |
DOUG FINE |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
TYPE OF
DESIGN |
ENGINEERING FIRM
OR REPAIRER |
10-20/2.20 |
01/16/2018 |
KURT HOFFMAN |
REDESIGN |
10-41/12 |
02/01/2018 |
STEPHEN PARKER |
ALTERATION |
10-38/10 |
02/05/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
10-20/2.14 |
02/13/2018 |
D&V CONSTRUCTION |
REPAIR |
10-27/9 |
03/14/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
10-30/21 |
03/27/2018 |
BIGGS |
ALTERATION |
10-49/15 |
03/22/2018 |
TBD |
REPAIR |
10-13/1 |
05/08/2018 |
|
REPAIR |
10-29/33.01 |
05/03/2018 |
CASTLE SEPTIC |
REPAIR |
10-28/25 |
05/10/2018 |
D & V |
REPAIR |
10-32/6 |
05/10/2018 |
CASTLE SEPTIC |
REPAIR |
10-16/31 |
05/30/2018 |
JOHN H. KEARNEY |
ALTERATION |
10-24/27.08 |
05/15/2018 |
BEDMINSTER EXCAVATION |
REPAIR |
10-34/13.01 |
05/30/2018 |
ERICA BUSCH |
ALTERATION |
10-36/15 |
06/06/2018 |
BAYER RISSE |
ALTERATION |
10-28/31 |
06/07/2018 |
BOB RUTAN |
REPAIR |
10-30/29 |
06/22/2018 |
BATCH BUILDING & REMODELING |
REPAIR |
10-37/34 |
07/02/2018 |
TRI COUNTY |
REPAIR |
10-37/42.01 |
08/06/2018 |
KURT HOFFMAN |
ALTERATION |
10-36/36 |
08/09/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
10-9/2 |
08/28/2018 |
BAYER RISSE |
ALTERATION |
10-42/1.02 |
09/06/2018 |
BOHREN & BOHREN |
NEW |
10-5/16 |
09/26/2018 |
PARKER ENGINEERING |
ALTERATION |
10-38/4 |
09/20/2018 |
R. HENRY HUELSEBUSCH |
ALTERATION |
10-10/5.01 |
09/21/2018 |
ROBERT K. RUTAN |
REPAIR |
10-29/22 |
09/24/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
10-30/32 |
09/26/2018 |
STINKY'S |
REPAIR |
10-27/18 |
10/15/2018 |
FREY ENGINEERING |
REDESIGN |
10-26/17.06 |
10/03/2018 |
CASTLE SEPTIC |
REPAIR |
10-10/5.02 |
10/29/2018 |
MOTT MCDONALD |
ALTERATION |
10-27/17 |
10/11/2018 |
CASTLE |
REPAIR |
10-16/39 |
10/17/2018 |
TRI COUNTY |
REPAIR |
10-39/7.05 |
10/17/2018 |
CASTLE SEPTIC |
REPAIR |
10-20/2.07 |
10/19/2018 |
KURT HOFFMAN |
ALTERATION |
10-49/19 |
11/2/2018 |
KURT HOFFMAN |
ALTERATION |
10-20/2.20 |
11/1/2018 |
KURT HOFFMAN |
REDESIGN |
10-49/6 |
12/4/2018 |
E & LP |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
11-17/14.01 |
03/28/2018 |
D & V |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
TYPE OF
DESIGN |
ENGINEERING FIRM
OR REPAIRER |
12-9/7 |
01/04/2018 |
BAYER RISSE |
ALTERATION |
12-10/17 |
01/03/2018 |
J H KEARNEY |
ALTERATION |
12-20/2 |
02/23/2018 |
E & LP |
ALTERATION |
12-7/5 |
03/01/2018 |
HERCULES SEPTIC |
REPAIR |
12-11/8 |
03/16/2018 |
ERICA BUSCH |
ALTERATION |
12-9/24 |
06/14/2018 |
KURT HOFFMAN |
ALTERATION |
12-15/1.01 |
06/07/2018 |
CASTLE SEPTIC |
REPAIR |
12-4/6.34 |
07/03/2018 |
RICH METZ |
REPAIR |
12-11/8 |
08/24/2018 |
CEDAR RIDGE |
REPAIR |
13-17/27 |
08/08/2018 |
LITTLE PINE |
REPAIR |
12-14/7.01 |
12/24/2018 |
HERCULES |
REPAIR |
12-20/1 |
12/28/2018 |
BEDMINSTER EXCAVATION |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
13-2/16.1 |
01/03/2018 |
ERICA BUSCH |
ALTERATION |
13-21/3.5 |
02/06/2018 |
HALF CIRCLE EXCAVATION |
REPAIR |
13-21/3 |
02/22/2018 |
YANNACCONE |
NEW |
13-4/11 |
03/20/2018 |
E & LP |
ALTERATION |
13-2/10 |
04/10/2018 |
E & LP |
ALTERATION |
13-5/18 |
04/10/2018 |
LITTLE PINE |
REPAIR |
13-26/32 |
05/07/2018 |
BEACHSTONE |
REPAIR |
13-13/8.01 |
05/29/2018 |
STEVE PARKER |
ALTERATION |
13-3/7 |
06/05/2018 |
KURT HOFFMAN |
ALTERATION |
13-26.01/1 |
07/30/2018 |
VAN CLEEF ENGINEERING |
ALTERATION |
13-26/21 |
10/30/2018 |
VOCHEY INDUSTRIES, INC. |
REPAIR |
13-2/2 |
10/03/2018 |
E & LP |
ALTERATION |
13-11/4.02 |
10/31/2018 |
ERICA BUSCH |
ALTERATION |
13-13/13 |
11/15/2018 |
STATEWIDE ENVIRONMENTAL SRVCS |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
14-26/30 |
10/16/2018 |
HERCULES |
REPAIR |
14-4/12.01 |
12/26/2018 |
KURT HOFFMAN |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
15-3.02/6 |
01/05/2018 |
PARKER ENGINEERING |
ALTERATION |
15-15/16 |
01/25/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
15-22/12.02 |
01/24/2018 |
CASTLE SEPTIC |
REPAIR |
15-25/65.35 |
02/06/2018 |
JK HOFFMAN |
REPAIR |
15-16.05/38 |
02/26/2018 |
KURT HOFFMAN |
ALTERATION |
15-17/82 |
02/27/2018 |
ERICA BUSCH |
ALTERATION |
15-15/16 |
03/08/2018 |
KURT HOFFMAN |
REDESIGN |
15-2/5.07 |
03/29/2018 |
FREY ENGINEERING |
NEW |
15-6/27 |
03/28/2018 |
KURT HOFFMAN |
ALTERATION |
15-15/1.03 |
04/17/2018 |
CASTLE SEPTIC |
REPAIR |
15-3/27.01 |
04/12/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
15-1/5.05 |
04/25/2018 |
DYKSTRA WALKER |
REDESIGN |
15-1/5.17 |
04/25/2018 |
DYKSTRA WALKER |
REDESIGN |
15-12/14 |
05/31/2018 |
BAYER RISSE |
ALTERATION |
15-13/9 |
05/22/2018 |
KURT HOFFMAN |
ALTERATION |
15-9/8.03 |
05/10/2018 |
CASTLE SEPTIC |
REPAIR |
15-10/4 |
05/14/2018 |
ERICA BUSCH |
NEW |
15-13/2.06 |
06/18/2018 |
ERICA BUSCH |
ALTERATION |
15-16.01/13 |
06/07/2018 |
CASTLE SEPTIC |
REPAIR |
15-25.01/65.42 |
06/26/2018 |
CASTLE SEPTIC |
REPAIR |
15-3/34 |
06/27/2018 |
CASTLE SEPTIC |
REPAIR |
15-3/65 |
06/29/2018 |
HERCULES |
REPAIR |
15-14/40 |
07/05/2018 |
ROBERT JOHNSON |
REPAIR |
15-17/18 |
07/31/2018 |
BIGGS ENGINEERING ASSOCIATES |
ALTERATION |
15-6/47.01 |
07/12/2018 |
CASTLE SEPTIC |
REPAIR |
15-17/71 |
07/16/2018 |
BAYER RISSE |
ALTERATION |
15-3.02/1 |
07/26/2018 |
RICK BEAVERS EXC. |
REPAIR |
15-17/81 |
08/10/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
15-6/81 |
08/20/2018 |
DOUG FINE |
ALTERATION |
15-6/49.04 |
08/29/2018 |
RIVER VALLEY SEPTIC |
REPAIR |
15-9/44 |
09/19/2018 |
KURT HOFFMAN |
ALTERATION |
15-24/14 |
10/31/2018 |
ERICA BUSCH |
ALTERATION |
15-13/37 |
10/02/2018 |
CASTLE SEPTIC |
REPAIR |
15-16/17 |
10/05/2018 |
CASTLE SEPTIC |
REPAIR |
15-25/14 |
10/19/2018 |
ERICA BUSCH |
ALTERATION |
15-14/49 |
10/16/2018 |
BAYER RISSE |
ALTERATION |
15-11/20 |
11/14/2018 |
ERICA BUSCH |
ALTERATION |
15-16/14.05 |
11/8/2018 |
CASTLE SEPTIC |
REPAIR |
15-3/124 |
11/26/2018 |
BOB RUTAN |
REPAIR |
15-14/69 |
11/27/2018 |
KURT HOFFMAN |
ALTERATION |
15-3/33 |
12/5/2018 |
ERICA BUSCH |
ALTERATION |
15-21/29 |
12/17/2018 |
JJ&B |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
16-18/7.07 |
01/24/2018 |
GOLDENBAUM BAILL |
ALTERATION |
16-8/54 |
01/22/2018 |
DOUG FINE |
ALTERATION |
16-14/11 |
02/14/2018 |
ASI (ADVANCED SEPTIC INSP) |
HOME INSPECTION REPORTS |
16-40/8.04 |
02/01/2018 |
DOUG FINE |
NEW |
16-20/7.07 |
02/07/2018 |
GREG BEAVERS |
REPAIR |
16-5/3 |
02/13/2018 |
WILLEVER EXCAVATING |
REPAIR |
16-14/11 |
02/14/2018 |
ERIC J. HERBEL |
REPAIR |
16-40/22.01 |
02/21/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
16-17/15.01 |
03/29/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
16-7/8.11 |
03/01/2018 |
DOUG FINE |
ALTERATION |
16-38/21 |
03/06/2018 |
ANDREW UBEL |
REPAIR |
16-26/5 |
03/22/2018 |
KURT HOFFMAN |
ALTERATION |
16-29/31.06 |
04/03/2018 |
CASTLE SEPTIC |
REPAIR |
16-39/15.02 |
04/09/2018 |
DOUGLAS FINE |
NEW |
16-1/3.18 |
04/17/2018 |
FRED JOHNSTON III |
REPAIR |
16-39/26 |
04/27/2018 |
BEAVERS LANDSCAPE |
REPAIR |
16-33/3.03 |
05/16/2018 |
BOHREN AND BOHREN |
NEW |
16-12/37.02 |
05/04/2018 |
CASTLE SEPTIC |
REPAIR |
16-4/7.16 |
05/14/2018 |
ERICA BUSCH |
ALTERATION |
16-7/8.01 |
06/28/2018 |
KURT HOFFMAN |
ALTERATION |
16-29/14 |
06/06/2018 |
KURT HOFFMAN |
ALTERATION |
16-19/6.01 |
06/14/2018 |
BAYER RISSE |
ALTERATION |
16-8/24 |
06/27/2018 |
BOHREN & BOHREN |
ALTERATION |
16-28/1 |
06/19/2018 |
JOSEPH FLOYD |
REPAIR |
16-26/9 |
07/13/2018 |
DYNAMIC EARTH, LLC |
ALTERATION |
16-1/7.10 |
07/13/2018 |
CASTEL SEPTIC |
REPAIR |
16-19/14.05 |
07/24/2018 |
STEPHEN PARKER |
NEW |
16-1.02/3.12 |
07/19/2018 |
TRI COUNTY |
REPAIR |
16-39/17 |
07/27/2018 |
DANIEL APGAR |
REPAIR |
16-14/31.01 |
07/17/2018 |
CASTLE SEPTIC |
REPAIR |
16-29/6.01 |
08/29/2018 |
DOUG FINE |
ALTERATION |
16-9/17.01 |
08/20/2018 |
LUSTER EXCAVATING, INC. |
REPAIR |
16-28/11.03 |
09/25/2018 |
LAND SOLUTIONS ENGINEERING |
NEW |
16-28/11.06 |
09/25/2018 |
LAND SOLUTIONS ENGINEERING |
NEW |
16-28/11.07 |
09/25/2018 |
LAND SOLUTIONS ENGINEERING |
NEW |
16-37/3.02 |
09/07/2018 |
RICHARD YARD PLUMBING |
REPAIR |
16-40/12.01 |
09/14/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
16-6/57 |
10/29/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
16-41/8.13 |
10/19/2018 |
ERIC RUPNARAIN |
ALTERATION |
16-8/7.01 |
10/01/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
16-29/22.02 |
10/03/2018 |
BAYER RISSE |
REDESIGN |
16-21/4.01 |
10/11/2018 |
DOUGLAS FINE, PE |
ALTERATION |
16-6/13.01 |
10/30/2018 |
HOFFMAN |
REDESIGN |
16-23/25.02 |
11/13/2018 |
CHARLIE TEIDEMAN |
ALTERATION |
16-12/37.02 |
11/15/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
16-27/4 |
12/11/2018 |
BAYER RISSE |
ALTERATION |
16-7/4 |
12/10/2018 |
CASTLE |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
17-1001/1.02 |
03/26/2018 |
J VINCH & SONS |
REPAIR |
17-1045/4 |
05/10/2018 |
CANTY MASONRY |
REPAIR |
17-1086/7-15 |
06/28/2018 |
E & LP |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
19-32/11.02 |
01/18/2018 |
KURT HOFFMAN |
NEW |
19-34/4 |
02/02/2018 |
ERICA BUSCH |
ALTERATION |
19-69/52.07 |
02/05/2018 |
D&V CONSTRUCTION |
REPAIR |
19-57/17.02 |
02/21/2018 |
GARDEN STATE SEPTIC |
REPAIR |
19-73/54 |
03/16/2018 |
WAYNE INGRAM, E&LP |
ALTERATION |
19-40/22 |
03/09/2018 |
KURT HOFFMAN |
ALTERATION |
19-37/27 |
03/22/2018 |
ERICA BUSCH |
ALTERATION |
19-24/18 |
03/14/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
19-49/63 |
03/19/2018 |
CIVIL ENGINEERING |
ALTERATION |
19-57/51 |
04/02/2018 |
KURT HOFFMAN |
ALTERATION |
19-73/7 |
04/09/2018 |
KURT HOFFMAN |
ALTERATION |
19-8/14 |
04/03/2018 |
CASTLE SEPTIC |
REPAIR |
19-54/18.01 |
04/26/2018 |
JAMES MANTZ |
REDESIGN |
19-66/12.04 |
04/12/2018 |
LITTLE PINE |
REPAIR |
19-49/1 |
04/24/2018 |
E & LP |
ALTERATION |
19-35/55 |
04/27/2018 |
HOCK EXCAVATING |
REPAIR |
19-53/20 |
05/30/2018 |
CAREAGA |
ALTERATION |
19-69/56.09 |
05/11/2018 |
BAUMANN & SONS, LLC |
REPAIR |
19-73/55.01 |
05/01/2018 |
D & V |
REPAIR |
19-53/10.03 |
05/02/2018 |
PEACH BROTHERS |
REPAIR |
19-61.01/27.16 |
05/04/2018 |
KURT HOFFMAN ENGINEERING |
REPAIR |
19-73/7 |
05/29/2018 |
KURT HOFFMAN |
REDESIGN |
19-46/25 |
05/16/2018 |
BEYER RISSE |
ALTERATION |
19-49/71.03 |
05/21/2018 |
BEDMINSTER EXCAVATING |
REPAIR |
19-67/2.05 |
05/21/2018 |
CLARK KUHAR |
REPAIR |
19-69/52.05 |
06/01/2018 |
911 SEPTIC |
REPAIR |
19-33/2.03 |
06/13/2018 |
D & V CONSTRUCTION |
REPAIR |
19-13/13 |
06/13/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
19-57/5 |
06/15/2018 |
DOUG FINE |
ALTERATION |
19-48/20.01 |
06/13/2018 |
CLARK KUHAR |
REPAIR |
19-35/40.03 |
06/26/2018 |
SCHAFFER CIVIL ENGINEERING |
ALTERATION |
19-32/10 |
06/27/2018 |
BIGGS ENGINEERING ASSOCIATES |
ALTERATION |
19-35/91.15 |
06/25/2018 |
CASTLE SEPTIC |
REPAIR |
19-12/10.01 |
06/28/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
19-69/11 |
07/13/2018 |
JEFFREY CARREAGE, PE |
ALTERATION |
19-73/8 |
07/02/2018 |
KURT HOFFMAN |
ALTERATION |
19-37/19.04 |
07/06/2018 |
KURT HOFFMAN |
ALTERATION |
19-30/23 |
07/02/2018 |
KURT HOFFMAN |
ALTERATION |
19-41/2 |
07/11/2018 |
STEVE PARKER |
ALTERATION |
19-10/27.01 |
07/06/2018 |
CLARK KUHAR |
REPAIR |
19-60/40 |
07/26/2018 |
CAREAGA ENGINEERING |
ALTERATION |
19-37/23.24 |
07/17/2018 |
J.K.HOFFMAN |
REPAIR |
19-29/34 |
07/25/2018 |
BOB RUTAN |
REPAIR |
19-26/10 |
08/24/2018 |
SUBURBAN CONSULTING ENGINEERS |
ALTERATION |
19-24/37.01 |
08/07/2018 |
CIVIL ENGINEERING |
ALTERATION |
19-38/5.02 |
08/16/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
19-37/28.02 |
08/06/2018 |
D&V CONSTRUCTION |
REPAIR |
19-12/10.13 |
08/30/2018 |
BEAVERS LANDSCAPE |
REPAIR |
19-35/91.02 |
08/23/2018 |
TRI COUNTY |
REPAIR |
19-46/17 |
08/16/2018 |
THE PUMPER |
REPAIR |
19-51/1 |
08/23/2018 |
DAN ACKERMAN CONTRACTING LLC |
REPAIR |
19-35/57 |
09/11/2018 |
MATARAZZO EXCAVATING |
REPAIR |
19-49/36 |
09/24/2018 |
R. HENRY HUELSEBUSCH |
ALTERATION |
19-37/28.01 |
09/13/2018 |
THE PUMPER |
REPAIR |
19-57/17.03 |
09/26/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
19-66/1 |
10/02/2018 |
KDP DEVELOPERS |
ALTERATION |
19-54/18.01 |
10/01/2018 |
JAMES MANTZ |
REDESIGN |
19-36/16 |
10/03/2018 |
KURT HOFFMAN |
ALTERATION |
19-12/45.04 |
10/17/2018 |
HERCULES |
REPAIR |
19-38/12 |
10/02/2018 |
THE PUMPER |
REPAIR |
19-49/71.03 |
10/01/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
19-69/3 |
10/11/2018 |
DELAWARE VALLEY |
REPAIR |
19-49/49 |
10/11/2018 |
HOFFMAN |
ALTERATION |
19-22/4 |
10/16/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
19-37/38 |
11/16/2018 |
PEACH BROTHERS |
REPAIR |
19-25/4 |
11/27/2018 |
PARKER ENGINEERING |
ALTERATION |
19-46/2.03 |
11/13/2018 |
KURT HOFFMAN |
ALTERATION |
19-12/38 |
11/13/2018 |
KURT HOFFMAN |
ALTERATION |
19-59/56.02 |
12/4/2018 |
MOUNTAIN VIEW DEVELOPMENT |
REPAIR |
19-77/2 |
12/10/2018 |
ERICA BUSCH |
ALTERATION |
19-11/41 |
12/26/2018 |
TOBY BARKMAN |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
21-40.04/37 |
01/25/2018 |
GOLDENBAUM BAILL |
NEW |
21-25/40 |
01/03/2018 |
BAYER RISSE |
ALTERATION |
21-72.26/4 |
01/25/2018 |
RBZ |
ALTERATION |
21-44/28 |
01/12/2018 |
KURT HOFFMAN |
ALTERATION |
21-14/29 |
01/03/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
21-79.08/16 |
01/19/2018 |
STEPHEN PARKER |
ALTERATION |
21-77.09/29 |
01/08/2018 |
JOHN P. MARTIN |
REPAIR |
21-22/14 |
01/22/2018 |
DOUGLAS E. FINE |
ALTERATION |
21-43/3.01 |
01/19/2018 |
BAYER RISSE |
ALTERATION |
21-99/12 |
01/17/2018 |
KEITH FIELDS |
REPAIR |
21-43/5.24 |
01/23/2018 |
HERCULES SEPTIC |
REPAIR |
21-15/19.20 |
01/30/2018 |
JOHN BRIANT, JJ&B SERVICES |
REPAIR |
21-75.01/15 |
02/16/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
21-5.01/16 |
02/20/2018 |
DOUG FINE |
ALTERATION |
21-72.25/5 |
02/02/2018 |
BEAVERS LANDSCAPE, LLC |
REPAIR |
21-6.18/19.04 |
02/12/2018 |
D&V CONSTRUCTION |
REPAIR |
21-75.02/14 |
02/26/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
21-6.12/16 |
02/21/2018 |
HERCULES SEPTIC |
REPAIR |
21-73/1.03 |
02/26/2018 |
STEPHEN PARKER |
ALTERATION |
21-73.04/1 |
03/09/2018 |
JOHN KEARNEY |
ALTERATION |
21-61/7 |
03/28/2018 |
DOUGLAS E. FINE |
ALTERATION |
21-22/20 |
03/26/2018 |
DOUGLAS FINE |
ALTERATION |
21-80.15/7 |
03/19/2018 |
BAYER RISSE |
ALTERATION |
21-5.01/5.19 |
03/12/2018 |
THE PUMPER |
REPAIR |
21-93/3 |
03/12/2018 |
JJ & B |
REPAIR |
21-43/12 |
03/19/2018 |
MESSEROLA EXCAVATING |
REPAIR |
21-6.17/3 |
03/26/2018 |
JJ&B SERVICES |
REPAIR |
21-60/33.08 |
03/26/2018 |
RICHARD METZ |
REPAIR |
21-79.11/5 |
03/23/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-79.11/12 |
03/28/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
21-16/3 |
03/29/2018 |
JOHN P. MARTIN EXCAVATING |
REPAIR |
21-14/1.10 |
04/17/2018 |
JOHN KEARNEY |
ALTERATION |
21-63.01/3.07 |
04/06/2018 |
HERCULES SEPTIC |
REPAIR |
21-80.14/6 |
04/09/2018 |
TRI COUNTY SEPTIC |
REPAIR |
21-61/6 |
04/13/2018 |
BAYER RISSE |
ALTERATION |
21-43/5.09 |
04/12/2018 |
GOLDENBAUM BAILL |
REDESIGN |
21-75/49 |
04/18/2018 |
JOHN P. MARTIN |
REPAIR |
21-72.14/19 |
04/18/2018 |
CASTLE SEPTIC |
REPAIR |
21-77.10/9 |
04/18/2018 |
RICK BEAVERS EXCAVATING |
REPAIR |
21-16/2 |
04/23/2018 |
BAYER RISSE |
ALTERATION |
21-6.01/7 |
04/23/2018 |
HICKS SEPTIC |
REPAIR |
21-16.01/53 |
04/27/2018 |
BEACHSTONE SEPTIC |
REPAIR |
21-72.32/27.01 |
04/27/2018 |
JJ & B |
REPAIR |
21-78.01/1.27 |
04/27/2018 |
RICHARD METZ |
REPAIR |
21-75/48 |
04/30/2018 |
BOB RUTAN |
REPAIR |
21-14.01/16 |
05/03/2018 |
RYAN CUNNINGHAM-LAZOR DEVELOP |
REPAIR |
21-76/3 |
05/02/2018 |
MARK DELLA VALLE |
REPAIR |
21-79.04/23 |
05/18/2018 |
CEDAR RIDGE |
REPAIR |
21-77/5.04 |
05/21/2018 |
CASTLE SEPTIC |
REPAIR |
21-5.01/10.13 |
05/21/2018 |
CASTLE SEPTIC |
REPAIR |
21-6.13/33 |
05/24/2018 |
CASTLE SEPTIC |
REPAIR |
21-77.02/17.01 |
05/24/2018 |
ED BUSH/DOUG FINE |
REPAIR |
21-72.26/11 |
05/25/2018 |
JJ & B SERVICES |
REPAIR |
21-73/45 |
06/04/2018 |
STEVE PARKER |
ALTERATION |
21-36.02/10 |
06/13/2018 |
KURT HOFFMAN |
ALTERATION |
21-80/14.12 |
06/01/2018 |
TRI COUNTY SEPTIC |
REPAIR |
21-72.28/10 |
06/05/2018 |
BAYER RISSE |
ALTERATION |
21-6.13/6 |
06/11/2018 |
PERFECTION EXCAVATING |
REPAIR |
21-77.09/46 |
06/15/2018 |
DOUGLAS E FINE |
ALTERATION |
21-72.13/14 |
06/06/2018 |
JJ & B SERVICES |
REPAIR |
21-25/2 |
06/14/2018 |
HERCULES |
REPAIR |
21-6.06/42 |
06/22/2018 |
|
REPAIR |
21-6/6.15 |
06/26/2018 |
BAYER RISSE |
ALTERATION |
21-6.10/32 |
06/27/2018 |
THE PUMPER, LLC |
REPAIR |
21-73.01/13 |
07/06/2018 |
KURT HOFFMAN |
ALTERATION |
21-6/8.08 |
07/11/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-13/7.06 |
07/11/2018 |
TBD |
REPAIR |
21-25/19.05 |
07/09/2018 |
ALLSTATE SEPTIC |
REPAIR |
21-24/31 |
07/03/2018 |
BAYER RISSE |
ALTERATION |
21-15/19.17 |
07/09/2018 |
CASTLE SEPTIC |
REPAIR |
21-72.14/28 |
07/12/2018 |
TBD |
REPAIR |
21-60/29.04 |
07/20/2018 |
DELLAVALLE EXCAVATION |
REPAIR |
21-6/6.01 |
07/19/2018 |
D&V CONSTRUCTION |
REPAIR |
21-72.24/12 |
07/25/2018 |
E & LP |
ALTERATION |
21-5.01/10.13 |
07/12/2018 |
HERCULES |
REPAIR |
21-83/5 |
07/19/2018 |
CASTLE SEPTIC |
REPAIR |
21-6.08/12 |
07/31/2018 |
LAWSON EXCAVATING, INC. |
REPAIR |
21-77.08/3 |
07/25/2018 |
BAYER RISSE |
ALTERATION |
21-15.05/5 |
07/26/2018 |
BOB RUTAN |
REPAIR |
21-13/7.10 |
07/26/2018 |
CASTLE SEPTIC |
REPAIR |
21-100/7 |
07/26/2018 |
HERCULES SEPTIC |
REPAIR |
21-72.14/29 |
07/31/2018 |
JOHN P. MARTIN EXCAVATING |
REPAIR |
21-6.08/25 |
07/30/2018 |
ROBERT K. RUTAN |
REPAIR |
21-15/3.03 |
08/01/2018 |
HERCULES SEPTIC & SEWER |
REPAIR |
21-6.13/4 |
08/06/2018 |
KURT HOFFMAN |
ALTERATION |
21-73.06/1 |
08/02/2018 |
DOBY & SON |
REPAIR |
21-63/50.02 |
08/02/2018 |
LITTLE PINE |
REPAIR |
21-81.01/19 |
08/08/2018 |
ERICA BUSCH |
ALTERATION |
21-72.28/20 |
08/07/2018 |
NEW JERSEY SEPTIC MANAGEMENT |
REPAIR |
21-6.07/12 |
08/09/2018 |
RICHARD YARD |
REPAIR |
21-89/20 |
08/13/2018 |
MICHAEL MESSICK PLUMBING |
REPAIR |
21-79/34.06 |
08/20/2018 |
LUSTER EXCAVATING, INC. |
REPAIR |
21-94/10 |
08/21/2018 |
HERCULES SEPTIC |
REPAIR |
21-14/1.25 |
08/23/2018 |
CASTLE SEPTIC |
REPAIR |
21-79/18.23 |
09/25/2018 |
JAMES MANTZ |
NEW |
21-79/18.24 |
09/25/2018 |
JAMES MANTZ |
NEW |
21-79/18.32 |
09/25/2018 |
JAMES MANTZ |
NEW |
21-79/18.33 |
09/25/2018 |
JAMES MANTZ |
NEW |
21-24/3.01 |
09/11/2018 |
RICK BEAVERS |
REPAIR |
21-25/19.02 |
09/14/2018 |
CONOVER CONTRACTING |
REPAIR |
21-72.24/7 |
09/12/2018 |
JJ & B SERVICES |
REPAIR |
21-81.02/30 |
09/12/2018 |
JJ & B SERVICES |
REPAIR |
21-7/56 |
09/14/2018 |
ROBERT K. RUTAN |
REPAIR |
21-15/3.17 |
09/26/2018 |
FREY ENGINEERING |
ALTERATION |
21-22/20 |
09/20/2018 |
EUGENE VAONSEL |
REPAIR |
21-81.05/12 |
10/02/2018 |
HERCULES |
REPAIR |
21-79.08/50 |
10/02/2018 |
TBD |
REPAIR |
21-63/70.17 |
10/15/2018 |
KURT HOFFMAN |
ALTERATION |
21-79/34.05 |
10/31/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-77.02/28 |
10/29/2018 |
CASTLE SEPTIC |
REPAIR |
21-63/70.02 |
10/24/2018 |
BEAVERS LANDSCAPING |
REPAIR |
21-63/70.17 |
10/25/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
21-6.07/36 |
11/13/2018 |
JOHN KEARNEY |
ALTERATION |
21-6/8.17 |
11/9/2018 |
RICK BEAVERS |
REPAIR |
21-75/44 |
11/14/2018 |
DOUG FINE |
ALTERATION |
21-63/70.21 |
11/8/2018 |
CASTLE SEPTIC |
REPAIR |
21-72.30/8 |
11/8/2018 |
JOHN MARTIN |
REPAIR |
21-25/3.11 |
11/29/2018 |
DOUG FINE |
REPAIR |
21-6/2.15 |
11/29/2018 |
DOUG FINE |
REPAIR |
21-15.05/2 |
11/27/2018 |
RICK BEAVERS |
REPAIR |
21-84.01/6 |
12/11/2018 |
LUSTER EXCAVATING |
REPAIR |
21-25/42 |
12/5/2018 |
DOUG FNE |
ALTERATION |
21-79.08/3.02 |
12/4/2018 |
THE PUMPER |
REPAIR |
21-79.09/18.02 |
12/4/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-79.04/10.01 |
12/12/2018 |
PARKER ENGINEERING |
ALTERATION |
21-25/3.17 |
12/14/2018 |
FAMILY CREST |
REPAIR |
21-86/24 |
12/17/2018 |
BAYER RISSE |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
22-53/14.01 |
01/09/2018 |
STEVE PARKER |
ALTERATION |
22-38/89 |
01/16/2018 |
DOUG FINE |
ALTERATION |
22-52/7.05 |
01/18/2018 |
PARKER ENGINEERING |
ALTERATION |
22-73/3.28 |
01/18/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-64/27.01 |
01/22/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-38/63 |
01/22/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-73/44 |
01/18/2018 |
KURT HOFFMAN |
ALTERATION |
22-64/49.01 |
01/17/2018 |
HERCULES |
REPAIR |
22-77/28.02 |
01/25/2018 |
JJ & B |
REPAIR |
22-39/48 |
02/15/2018 |
WHERE OLD MEETS NEW, LLC |
REPAIR |
22-38/22 |
03/29/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-97/2.19 |
03/29/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-14/7.06 |
03/29/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-66/19.28 |
03/23/2018 |
D & V |
REPAIR |
22-42/12.06 |
03/12/2018 |
CARMINE ANTONUCCIO |
REPAIR |
22-68.01/10.28 |
03/27/2018 |
THE PUMPER, LLC |
REPAIR |
22-72/34.04 |
03/28/2018 |
LANGE CONSTRUCTION |
REPAIR |
22-28/22.01 |
04/24/2018 |
JAMES MANTZ |
ALTERATION |
22-52/13.04 |
04/10/2018 |
ROBERT K. RUTAN |
REPAIR |
22-1.01/2.04 |
04/27/2018 |
TRIPLE K EXCAVATING |
REPAIR |
22-73/40.03 |
05/10/2018 |
HOUSER ENGINEERING |
ALTERATION |
22-51.02/38 |
05/17/2018 |
TED BAYER |
NEW |
22-39/69 |
05/29/2018 |
E & LP |
ALTERATION |
22-13/62.01 |
05/17/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-70.01/16.01 |
05/17/2018 |
E & LP |
ALTERATION |
22-4/30 |
05/17/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-70/18 |
05/07/2018 |
E & LP |
ALTERATION |
22-93/21.01 |
05/17/2018 |
STEPHEN PARKER |
ALTERATION |
22-97/5 |
05/04/2018 |
TBD |
REPAIR |
22-55/13.42 |
05/10/2018 |
TBD |
REPAIR |
22-67.01/19.31 |
05/07/2018 |
BEAVERS LANDSCAPE |
REPAIR |
22-64/24.06 |
05/10/2018 |
GUARDIAN CONTRACTING |
REPAIR |
22-97/2.14 |
05/23/2018 |
RCHARD METZ |
REPAIR |
22-45.01/66 |
05/21/2018 |
TOBY BARKMAN |
REPAIR |
22-72/36.05 |
05/22/2018 |
TOBY BARKMAN |
REPAIR |
22-71/5.02 |
05/25/2018 |
KEITH FIELDS |
REPAIR |
22-38/30 |
06/28/2018 |
G GLOEDE AND ASSOCIATES |
ALTERATION |
22-9/14 |
06/29/2018 |
APGAR ASSOCIATES |
ALTERATION |
22-74/39 |
06/29/2018 |
KURT HOFFMAN |
ALTERATION |
22-97/2.16 |
06/07/2018 |
JJ & B SERVICES |
REPAIR |
22-73/3.29 |
06/06/2018 |
RICHARD METZ |
REPAIR |
22-70/31.44 |
06/07/2018 |
BOB RUTAN |
REPAIR |
22-57.01/11.15 |
06/14/2018 |
HERCULES SEPTIC |
REPAIR |
22-98/6.01 |
06/12/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
22-72/36.09 |
06/12/2018 |
D & V |
REPAIR |
22-46.01/5.25 |
06/25/2018 |
D GULICK |
REPAIR |
22-74.01/7 |
06/25/2018 |
MARK HENDRICKSON |
REPAIR |
22-15/18 |
06/27/2018 |
JOHN ALEXATOS |
REPAIR |
22-39/21.10 |
06/29/2018 |
D GULICK |
REPAIR |
22-51.02/40 |
07/19/2018 |
PARKER ENGINEERING |
ALTERATION |
22-42/9.04 |
07/18/2018 |
JAMES J. MANTZ, PE & LS |
NEW |
22-44/10.02 |
07/17/2018 |
KEN LANGE |
REPAIR |
22-66/19.06 |
07/19/2018 |
BEAVERS LANDSCAPE LLC |
REPAIR |
22-55/13.39 |
07/20/2018 |
TRI COUNTY |
REPAIR |
22-39/37 |
07/27/2018 |
RICK BEAVERS |
REPAIR |
22-66/19.06 |
07/19/2018 |
BEAVERS LANDSCAPE |
REPAIR |
22-70/31.33 |
08/22/2018 |
DOUG FINE |
ALTERATION |
22-38/47 |
08/17/2018 |
TRITON GROUP LLC |
ALTERATION |
22-73/30 |
08/16/2018 |
BAYER RISSE |
ALTERATION |
22-51.03/7 |
08/16/2018 |
BAYER RISSE |
ALTERATION |
22-51/55 |
08/16/2018 |
KURT HOFFMAN |
ALTERATION |
22-46/15.01 |
08/16/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
22-54/1.04 |
08/29/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-66/25.10 |
08/14/2018 |
D GULICK |
REPAIR |
22-72.01/34.13 |
08/23/2018 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
22-51/2.17 |
09/26/2018 |
DOUGLAS FINE, PE |
ALTERATION |
22-75/13 |
09/24/2018 |
BAYER RISSE |
ALTERATION |
22-51.02/1.01 |
09/24/2018 |
KURT HOFFMAN |
ALTERATION |
22-59/1 |
09/06/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
22-52/13.28 |
09/11/2018 |
BOB RUTAN |
REPAIR |
22-73/11 |
10/19/2018 |
PARKER |
ALTERATION |
22-70/27.30 |
10/18/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
22-48/38 |
10/18/2018 |
BAYER RISSE |
ALTERATION |
22-70/41.25 |
10/19/2018 |
D GULICK |
REPAIR |
22-66/19.32 |
10/24/2018 |
911 SEPTIC PUMPING AND REPAIR |
REPAIR |
22-66/19.67 |
10/24/2018 |
RICH METZ |
REPAIR |
22-38/82 |
11/19/2018 |
JOHN KEARNEY |
ALTERATION |
22-70/17.28 |
11/27/2018 |
PARKER ENGINEERING |
ALTERATION |
22-65/10 |
11/27/2018 |
PARKER ENGINEERING |
ALTERATION |
22-42/12.01 |
11/16/2018 |
BAYER RISSE |
ALTERATION |
22-71/11.01 |
11/27/2018 |
DOUG FINE |
ALTERATION |
22-50/20 |
11/16/2018 |
FREY ENGINEERING |
ALTERATION |
22-70/27.25 |
11/7/2018 |
HERCULES |
REPAIR |
22-55/30 |
11/29/2018 |
SF LUTZKY |
REPAIR |
22-66/23 |
12/17/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
22-93/21 |
12/14/2018 |
KURT HOFFMAN |
ALTERATION |
22-52/6 |
12/13/2018 |
BAYER RISSE |
ALTERATION |
22-53/9.14 |
12/13/2018 |
BAYER RISSE |
ALTERATION |
22-64/8.22 |
12/4/2018 |
ROBERT RUTAN |
REPAIR |
22-38/50.01 |
12/10/2018 |
BOB RUTAN |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
24-51/32 |
01/11/2018 |
KURT HOFFMAN |
ALTERATION |
24-14/39 |
01/08/2018 |
BEDMINSTER EXCAVATION |
REPAIR |
24-28/7 |
01/31/2018 |
THE PUMPER, LLC |
REPAIR |
24-37.03/13 |
02/08/2018 |
TRI COUNTY SEPTIC |
REPAIR |
24-38/16.06 |
02/22/2018 |
GS LIKUS |
REPAIR |
24-51/71.02 |
02/13/2018 |
HICKS SEPTIC |
REPAIR |
24-11/35.01 |
03/28/2018 |
STEPHEN PARKER |
ALTERATION |
24-9/3.01 |
04/23/2018 |
HERCULES SEPTIC |
REPAIR |
24-11/22.11 |
04/27/2018 |
JJ& B |
REPAIR |
24-27/83 |
05/15/2018 |
TIM TERRY EXCAVATING |
REPAIR |
24-27/24 |
05/29/2018 |
KURT HOFFMAN |
REPAIR |
24-7/4.08 |
06/25/2018 |
BIGGS ENGINEERING ASSOCIATES |
ALTERATION |
24-36/3.19 |
06/25/2018 |
JEREMY HANN |
REPAIR |
24-6.06/6 |
06/27/2018 |
THE PUMPER, LLC |
REPAIR |
24-10/5.02 |
07/12/2018 |
E&LP |
ALTERATION |
24-19/8 |
07/17/2018 |
PARKER ENGINEERING & SURVEYING |
ALTERATION |
24-28/21 |
07/11/2018 |
PARKER ENGINEERING & SURVEYING |
ALTERATION |
24-27/27 |
07/11/2018 |
KURT HOFFMAN |
ALTERATION |
24-32/37.04 |
07/13/2018 |
TRI COUNTY |
REPAIR |
24-11/22.10 |
07/20/2018 |
GLEN LIKUS |
REPAIR |
24-14/17.14 |
07/17/2018 |
TRI COUNTY SEPTIC |
REPAIR |
24-5/1.13 |
07/19/2018 |
HICKS SEPTIC |
REPAIR |
24-32/49 |
07/24/2018 |
KURT HOFFMAN |
REDESIGN |
24-16/2 |
07/06/2018 |
HERCULES SEPTIC |
REPAIR |
24-47.01/45.01 |
08/24/2018 |
E & LP |
ALTERATION |
24-3/2 |
08/09/2018 |
STEVE PARKER |
ALTERATION |
24-14/32 |
08/21/2018 |
DYKSTRA WALKER |
ALTERATION |
24-6.04/1 |
08/09/2018 |
DOUGLAS E. FINE, P.E. |
ALTERATION |
24-16/2.08 |
08/07/2018 |
PEACH BROTHERS |
REPAIR |
24-27/147.03 |
08/16/2018 |
BEDMINSTER EXCAVATING |
REPAIR |
24-37/3.07 |
08/17/2018 |
PARKER |
ALTERATION |
24-27/145.04 |
08/16/2018 |
BOB RUTAN |
REPAIR |
24-27/51 |
08/30/2018 |
STEVE PARKER |
ALTERATION |
24-29/4 |
08/22/2018 |
G.S. LIKUS |
REPAIR |
24-14/7 |
09/06/2018 |
PARKER ENGINEERING |
ALTERATION |
24-6.01/24.11 |
09/05/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
24-6/27.11 |
09/20/2018 |
TOBY BARKMAN |
REPAIR |
24-34/13.03 |
09/26/2018 |
J.K. HOFFMAN & SON |
REPAIR |
24-6/24.24 |
10/22/2018 |
KURT HOFFMAN |
ALTERATION |
24-32/4 |
10/09/2018 |
BAYER-RISSE |
NEW |
24-38/16.29 |
10/11/2018 |
TOBY BARKMAN EXCAVATING |
REPAIR |
24-6.02/24.02 |
10/26/2018 |
PARKER ENGINEERING |
ALTERATION |
24-35/10.20 |
10/29/2018 |
BEACHSTONE SEPTIC |
REPAIR |
24-6.06/11 |
10/29/2018 |
THE PUMPER |
REPAIR |
24-37.03/5.04 |
10/31/2018 |
CASTLE SEPTIC |
REPAIR |
24-27/84 |
11/28/2018 |
E & LP |
ALTERATION |
24-47.01/42 |
11/8/2018 |
PARKER ENGINEERING |
ALTERATION |
24-18/7 |
11/1/2018 |
BAYER-RISSE |
ALTERATION |
24-32/7.07 |
11/7/2018 |
BAYER-RISSE |
ALTERATION |
24-45/6.02 |
11/19/2018 |
GLADSTONE DESIGN |
NEW |
24-35/11 |
11/8/2018 |
D&V CONSTR |
REPAIR |
24-32/11 |
11/13/2018 |
EARTHCARE |
REPAIR |
24-19/14.02 |
11/16/2018 |
THE PUMPER |
REPAIR |
24-6.02/24.08 |
11/26/2018 |
THE PUMPER |
REPAIR |
24-6.04/7.14 |
11/29/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
24-6.04/8 |
12/5/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
25-14/30 |
02/13/2018 |
KENNY LANGE CONSTRUCTION, LLC |
REPAIR |
25-17/4.07 |
02/26/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
26-26/30 |
02/07/2018 |
G BARKLEY ENGINEERING |
ALTERATION |
26-13/26 |
02/07/2018 |
GREGG BARKLEY |
ALTERATION |
25-17.01/16 |
03/16/2018 |
BAYER RISSE |
ALTERATION |
25-28/5.07 |
03/14/2018 |
CASTLE SEPTIC |
REPAIR |
25-11/4.03 |
04/27/2018 |
TEMPLIN ENGINEERING ASSOCIATES |
ALTERATION |
25-28/5.02 |
04/12/2018 |
CASTLE SEPTIC |
REPAIR |
25-21.02/32.02 |
04/12/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
25-5/16.07 |
04/18/2018 |
BAYER RISSE |
ALTERATION |
25-30.01/8 |
04/23/2018 |
HERCULES SEPTIC |
REPAIR |
25-1.01/1 |
04/23/2018 |
BAYER-RISSE ENGINEERING |
ALTERATION |
25-17.01/22 |
04/27/2018 |
TRICOUNTY SEPTIC |
REPAIR |
25-17/24 |
05/23/2018 |
KURT HOFFMAN ENGINEERING |
NEW |
25-9/20.01 |
05/03/2018 |
HERCULES SEPTIC |
REPAIR |
25-15/54 |
05/08/2018 |
ERICA BUSCH |
ALTERATION |
25-22/45 |
06/01/2018 |
ERICA BUSCH |
ALTERATION |
25-28/4 |
06/06/2018 |
TRI COUNTY |
REPAIR |
25-30/30 |
06/07/2018 |
TBD |
REPAIR |
25-17/25 |
06/06/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
25-16/3 |
06/28/2018 |
JOHN KEARNEY |
ALTERATION |
25-28/5.02 |
06/27/2018 |
CASTLE SEPTIC |
REPAIR |
25-1.09/33.02 |
07/06/2018 |
KURT HOFFMAN |
ALTERATION |
25-1.09/9 |
07/20/2018 |
KURT HOFFMAN |
ALTERATION |
25-16/4.05 |
07/09/2018 |
CASTLE SEPTIC |
REPAIR |
25-22/24 |
08/07/2018 |
COPPOLA/ALEX NARREA |
HOME INSPECTION REPORTS |
25-22/24 |
08/07/2018 |
CAREAGA |
ALTERATION |
25-25/2 |
08/06/2018 |
LITTLE PINE EQUIPMENT |
REPAIR |
25-21/29.13 |
09/11/2018 |
PARKER ENGINEERING |
ALTERATION |
25-22/5 |
09/05/2018 |
BAYER RISSE |
NEW |
25-27/7.01 |
09/19/2018 |
PARKER ENGINEERING |
ALTERATION |
25-19/12.02 |
09/20/2018 |
MARTIN EXCAVATING |
REPAIR |
25-22/31.04 |
10/02/2018 |
CASTLE SEPTIC |
REPAIR |
25-17/22 |
10/11/2018 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
25-29/9.03 |
10/02/2018 |
DELAWARE VALLEY SEPTIC |
REPAIR |
25-11/9 |
10/10/2018 |
JR CONTRACTING |
REPAIR |
25-1.05/18 |
10/24/2018 |
HUELSEBUSCH |
ALTERATION |
25-11/15 |
10/22/2018 |
MAIO CONSTRUCTION |
REPAIR |
25-22/25.14 |
10/24/2018 |
TOBY BARKMAN |
REPAIR |
25-14/22.02 |
11/9/2018 |
KURT HOFFMAN |
ALTERATION |
25-17/4.08 |
11/7/2018 |
KURT HOFFMAN |
ALTERATION |
25-9/1.05 |
11/26/2018 |
HOCK EXCAVATING |
REPAIR |
25-28/26 |
12/5/2018 |
KURT HOFFMAN |
ALTERATION |
25-22.02/16 |
12/4/2018 |
BEAVERS LANSCAPING |
REPAIR |
25-30/28 |
12/11/2018 |
KURT HOFFMAN |
ALTERATION |
25-28/40 |
12/19/2018 |
CASTLE SEPTIC |
REPAIR |
25-17/4.41 |
12/24/2018 |
CASTLE SEPTIC |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
26-31/5 |
01/18/2018 |
GOLDENBAUM BAILL ASSOCIATES |
NEW |
26-12/9 |
01/04/2018 |
WAYNE INGRAM |
ALTERATION |
26-13/8 |
01/09/2018 |
BAYER RISSE |
ALTERATION |
26-28/14 |
01/30/2018 |
MICHAEL J. MESSICK |
REPAIR |
26-38/29 |
01/30/2018 |
KDP DEVELOPERS |
REPAIR |
26-52/1 |
05/31/2018 |
SCHLACHTER |
ALTERATION |
26-13/22 |
06/19/2018 |
G BARKLEY |
ALTERATION |
26-14/38 |
06/28/2018 |
DOUG FINE |
ALTERATION |
26-11/37 |
07/16/2018 |
G BARKLEY |
NEW |
26-28/11 |
07/31/2018 |
NJ SEPTIC MANAGEMENT |
REPAIR |
26-26/17 |
07/18/2018 |
BAYER-RISSE ENGINEERING |
REDESIGN |
26-11/6 |
08/08/2018 |
BAYER RISSE |
ALTERATION |
26-46/1 |
08/01/2018 |
G BARKLEY ENGINEERING, LLC |
ALTERATION |
26-17/20.05 |
08/06/2018 |
MICHAEL J. MESSICK PLUMBING |
REPAIR |
26-8/28.03 |
08/30/2018 |
BAYER-RISSE ENGINEERING |
REDESIGN |
26-14/12 |
09/06/2018 |
TRIPLE K EXCAVATING |
REPAIR |
26-12/57 |
09/24/2018 |
LUSTER EXCAVATING |
REPAIR |
26-21/23 |
10/03/2018 |
DOUGLAS E. FINE, PE |
ALTERATION |
26-18/19 |
10/10/2018 |
BAYER RISSE |
REDESIGN |
26-3.04/1 |
10/24/2018 |
STINKY'S SEPTIC SERVICES |
REPAIR |
26-41/2.01 |
11/1/2018 |
D & V |
REPAIR |
26-23/25.02 |
11/1/2018 |
BAYER RISSE |
ALTERATION |
26-7/4 |
11/29/2018 |
BAYER RISSE |
ALTERATION |
26-38/5 |
12/4/2018 |
PARKER ENGINEERING |
ALTERATION |
26-20/9.02 |
12/5/2018 |
GOLDENBAUM BIALL |
ALTERATION |
26-21/48 |
12/3/2018 |
PARKER ENGINEERING |
ALTERATION |
26-16/11 |
12/5/2018 |
BAYER RISSE |
ALTERATION |
- |
- |
- |
- |
TO TOP
|