|
WELCOME TO THE
HUNTERDON COUNTY
DEPARTMENT OF HEALTH
Environmental Health Services
201 SEPTIC DESIGN APPROVALS
View: 2019 | 2018 | 2017 | 2016 |
The Reference Number is the Township (using the Geo-Code) and the Block/Lot Number
For Example: Alexandria Township Block 1 , Lot 1. Would be 01-1/1 |
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
01-2/46 |
01/24/2019 |
GOLDENBAUM BIALL |
ALTERATION |
01-13.01/3.30 |
02/25/2019 |
KURT HOFFMAN |
ALTERATION |
01-21/31.01 |
02/14/2019 |
KURT HOFFMAN |
ALTERATION |
01-15.01/8.70 |
02/28/2019 |
KURT HOFFMAN |
ALTERATION |
01-14/17.03 |
02/21/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
01-13/18 |
03/20/2019 |
KURT HOFFMAN |
ALTERATION |
01-4/22 |
03/20/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
01-7/45 |
03/07/2019 |
CASTLE |
REPAIR |
01-11/2.01 |
03/15/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
01-7/21.01 |
03/18/2019 |
CASTLE SEPTIC |
REPAIR |
01-15/25 |
04/05/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
01-8/3 |
04/15/2019 |
DOUG FINE |
ALTERATION |
01-6/11.10 |
04/16/2019 |
KENNY LANG |
REPAIR |
01-21/16.25 |
04/16/2019 |
CASTLE SEPTIC |
REPAIR |
01-18/27.03 |
04/16/2019 |
CASTLE SEPTIC |
REPAIR |
01-7/30.01 |
04/29/2019 |
BAYER RISSE |
ALTERATION |
01-2/15.09 |
04/30/2019 |
CASTLE SEPTIC |
REPAIR |
01-7/16.01 |
05/14/2019 |
|
REPAIR |
01-20.02/1 |
05/14/2019 |
ERICA BUSCH |
ALTERATION |
01-2/37 |
05/16/2019 |
GS LIKUS |
REPAIR |
01-5/19.01 |
05/22/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
01-10/24.01 |
05/30/2019 |
BOB RUTAN |
REPAIR |
01-15/33 |
05/30/2019 |
RICK BEAVERS |
REPAIR |
01-10/36.01 |
06/24/2019 |
THOMAS J FORSYTHE JR. |
ALTERATION |
01-10/28.09 |
06/26/2019 |
HOFFMAN |
ALTERATION |
01-2/10.01 |
06/03/2019 |
KURT HOFFMAN |
ALTERATION |
01-22/22 |
06/11/2019 |
SHAFFER |
ALTERATION |
01-18/36.03 |
06/11/2019 |
KURT HOFFMAN |
NEW |
01-19/12.03 |
06/06/2019 |
MARK HENDRICKSON |
REPAIR |
01-9/14.04 |
06/12/2019 |
THE PUMPER |
REPAIR |
01-5/1 |
07/08/2019 |
KURT HOFFMAN |
ALTERATION |
01-15/30 |
07/24/2019 |
KURT HOFFMAN |
ALTERATION |
01-18.01/56 |
07/17/2019 |
KURT HOFFMAN |
ALTERATION |
01-2/9 |
07/30/2019 |
G GLOEDE |
ALTERATION |
01-17.02/1 |
07/09/2019 |
CASTLE |
REPAIR |
01-11/15.17 |
07/16/2019 |
RICK BEAVERS |
REPAIR |
01-2/1.03 |
07/16/2019 |
ALBERT HUTKOWSKI |
REPAIR |
01-6/11.32 |
07/29/2019 |
LIL PINE |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
02-44/31 |
01/14/2019 |
E & LP |
ALTERATION |
02-44/15 |
01/03/2019 |
FERRIERO |
ALTERATION |
02-34.02/12 |
01/03/2019 |
D & V |
REPAIR |
02-38/6.02 |
02/15/2019 |
DEL VAL SEPTIC |
REPAIR |
02-43/6.01 |
03/07/2019 |
RICK BEAVERS |
REPAIR |
02-8/9.21 |
03/18/2019 |
CASTLE SEPTIC |
REPAIR |
02-8/16 |
03/28/2019 |
BAYER-RISSE |
ALTERATION |
02-5/26 |
04/01/2019 |
LANGE CONSTRUCTION |
REPAIR |
02-32/16 |
04/08/2019 |
KURT HOFFMAN |
ALTERATION |
02-6/30.02 |
04/15/2019 |
ERICA BUSCH |
ALTERATION |
02-47/4.14 |
04/05/2019 |
CASTLE SEPTIC |
REPAIR |
02-38.01/14 |
04/25/2019 |
MARK HENDRICKSON EXCAVATING |
REPAIR |
02-47/4.09 |
04/15/2019 |
KURT HOFFMAN |
ALTERATION |
02-37/9.34 |
04/15/2019 |
BOB RUTAN |
REPAIR |
02-44/13.03 |
05/02/2019 |
ECOFRESH LLC |
REPAIR |
02-3/3 |
05/28/2019 |
KURT HOFFMAN |
ALTERATION |
02-5/18.03 |
05/10/2019 |
TRI COUNTY SEPTIC |
REPAIR |
02-48/26.03 |
05/17/2019 |
BAYER-RISSE |
ALTERATION |
02-9/6.04 |
05/17/2019 |
RICK BEAVERS |
REPAIR |
02-5/25 |
06/11/2019 |
PARKER |
ALTERATION |
02-47/4.05 |
06/20/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
02-36/19 |
06/11/2019 |
STEVE PARKER |
ALTERATION |
02-33/27.03 |
06/14/2019 |
TIM TERRY LANDSCAPE/EXCAVATING |
REPAIR |
02-42/21 |
06/14/2019 |
D&V CONSTRUCTION |
REPAIR |
02-38/1.04 |
06/20/2019 |
BOB RUTAN |
REPAIR |
02-38/2.02 |
06/27/2019 |
BEACHSTONE |
REPAIR |
02-48/26.61 |
06/27/2019 |
TRI COUNTY SEPTIC |
REPAIR |
02-12/12 |
07/12/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
02-6/29 |
07/12/2019 |
KURT HOFFMAN |
REDESIGN |
02-8/18.01 |
07/17/2019 |
E & LP |
ALTERATION |
02-3/8.05 |
07/19/2019 |
CEDAR RIDGE |
REPAIR |
- |
- |
- |
- |
TO TOP
BLOOMSBURY BOROUGH - 03 |
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
03-29/1 |
01/08/2019 |
KURT HOFFMAN |
ALTERATION |
03-9/1.02 |
02/06/2019 |
DOUG FINE |
ALTERATION |
03-26/20 |
04/04/2019 |
KURT HOFFMAN |
ALTERATION |
03-26/1 |
04/22/2019 |
KURT HOFFMAN |
ALTERATION |
03-25/11 |
05/07/2019 |
KURT HOFFMAN |
ALTERATION |
03-19/3 |
06/26/2019 |
E & LP |
ALTERATION |
03-14/20 |
07/26/2019 |
SAMSON CONCRETE |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
04-20/27.01 |
04/30/2019 |
THE PUMPER |
REPAIR |
04-4.02/12 |
05/28/2019 |
KURT HOFFMAN |
ALTERATION |
04-13/4 |
05/13/2019 |
JK HOFFMAN |
REPAIR |
04-18/22 |
05/30/2019 |
BEACHSTONE |
REPAIR |
04-5/1.06 |
06/27/2019 |
THE PUMPER |
REPAIR |
04-18/16 |
07/23/2019 |
KURT HOFFMAN |
ALTERATION |
04-19/8 |
07/25/2019 |
KURT HOFFMAN |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
06-90/4 |
01/14/2019 |
BAYER RISSE |
ALTERATION |
06-25/14.06 |
01/03/2019 |
ERICA BUSCH |
ALTERATION |
06-5/3 |
01/03/2019 |
ISABELLA TRIPOLI |
REPAIR |
06-15/6 |
01/11/2019 |
TRIPLE K |
REPAIR |
06-89/34 |
01/08/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-82.13/60 |
01/10/2019 |
ERICA BUSCH |
ALTERATION |
06-12/18.15 |
01/10/2019 |
CASTLE SEPTIC |
REPAIR |
06-16/25 |
01/29/2019 |
BAYER RISSE |
ALTERATION |
06-3.02/19 |
01/24/2019 |
KURT HOFFMAN |
ALTERATION |
06-34.06/16.12 |
01/28/2019 |
TRI COUNTY |
REPAIR |
06-9/4.04 |
01/29/2019 |
D&V |
REPAIR |
06-4/28 |
02/04/2019 |
BRIAN WIUNDER |
REPAIR |
06-91.04/33 |
02/04/2019 |
BAYER RISSE |
ALTERATION |
06-10/14 |
02/08/2019 |
HOFFMAN |
ALTERATION |
06-87/4.03 |
02/06/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
06-21/8.17 |
02/15/2019 |
DOBY & SON |
REPAIR |
06-82.17/48 |
02/08/2019 |
CASTLE SEPTIC |
REPAIR |
06-80/7 |
02/28/2019 |
BAYER RISSE |
ALTERATION |
06-13.01/3 |
02/19/2019 |
PARKER ENGINEERING |
ALTERATION |
06-4/14 |
02/25/2019 |
CASTLE SEPTIC |
REPAIR |
06-90/17.12 |
02/25/2019 |
JJ & B |
REPAIR |
06-45/8 |
03/18/2019 |
ERICA BUSCH |
ALTERATION |
06-28.01/13.06 |
03/07/2019 |
D GULICK |
REPAIR |
06-3/20 |
03/12/2019 |
BAYER-RISSE ENGINEERING |
ALTERATION |
06-20/3.06 |
03/11/2019 |
DEL VAL SEPTIC |
REPAIR |
06-4.03/7 |
03/14/2019 |
STEVE PARKER |
ALTERATION |
06-90/14.16 |
03/20/2019 |
911 CARTING |
REPAIR |
06-82.14/17 |
03/28/2019 |
TRI COUNTY |
REPAIR |
06-4.01/4 |
04/30/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
06-87/50 |
04/15/2019 |
E & LP |
ALTERATION |
06-87.01/5 |
04/01/2019 |
DOVER ENVIRONMENTAL SCIENCES |
REPAIR |
06-60.02/7 |
04/02/2019 |
KENNY LANGE |
REPAIR |
06-16/66 |
04/05/2019 |
CASTLE SEPTIC |
REPAIR |
06-12/18.14 |
04/08/2019 |
TRI-COUNTY SEPTIC |
REPAIR |
06-46/16 |
04/25/2019 |
G GLEODE |
ALTERATION |
06-82.13/61.05 |
04/15/2019 |
BOB RUTAN |
REPAIR |
06-87/39 |
04/15/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-34/8.01 |
04/18/2019 |
TRIPLE K EXCAVATING |
REPAIR |
06-1/26.15 |
04/18/2019 |
D&V CONSTRUCTION |
REPAIR |
06-81/5 |
04/25/2019 |
BAYER-RISSE |
ALTERATION |
06-60.02/13 |
04/30/2019 |
D&V CONSTRUCTION |
REPAIR |
06-7/18.03 |
05/01/2019 |
SOURCE 1A LLC |
REPAIR |
06-34/2.01 |
05/20/2019 |
E & LP |
ALTERATION |
06-87/5.10 |
05/21/2019 |
DOUG FINE |
ALTERATION |
06-34/4.02 |
05/10/2019 |
BAYERÂ RISSE |
ALTERATION |
06-20/3.10 |
05/09/2019 |
RICK BEAVERS |
REPAIR |
06-91/10 |
05/13/2019 |
HERCULES |
REPAIR |
06-82.13/61.02 |
05/16/2019 |
RUTAN |
REPAIR |
06-58/6.02 |
05/22/2019 |
MIKE MESSICK PLUMBING |
REPAIR |
06-34/10.06 |
05/30/2019 |
BOB RUTAN |
REPAIR |
06-80/5 |
05/30/2019 |
MATARAZZO |
REPAIR |
06-28/3.03 |
05/30/2019 |
RICH PFAUTH |
REPAIR |
06-40/3.04 |
06/11/2019 |
E & LP |
ALTERATION |
06-34/6.03 |
06/06/2019 |
KURT HOFFMAN |
ALTERATION |
06-88/17.03 |
06/06/2019 |
D GULICK |
REPAIR |
06-9/3.02 |
06/06/2019 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
06-9/3.10 |
06/06/2019 |
RICK BEAVERS |
REPAIR |
06-1/26.03 |
06/06/2019 |
RICK BEAVERS |
REPAIR |
06-39/4.02 |
06/06/2019 |
LIKUS |
REPAIR |
06-34/6.07 |
06/18/2019 |
BAYER RISSE |
ALTERATION |
06-29/13 |
06/18/2019 |
BAYER RISSE |
ALTERATION |
06-60.03/85.13 |
06/27/2019 |
LIL PINE |
REPAIR |
06-90/2.04 |
06/18/2019 |
D&V CONSTRUCTION |
REPAIR |
06-60/59.04 |
06/18/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-82.13/61.38 |
06/20/2019 |
KOLLMER OUTDOOR SERVICES |
REPAIR |
06-47.02/1 |
07/11/2019 |
ENGINEERING & LAND PLANNING |
NEW |
06-16/45 |
07/10/2019 |
ERICA BUSCH |
ALTERATION |
06-91.03/1 |
07/02/2019 |
PARKER ENGINEERING |
ALTERATION |
06-82.13/61.19 |
07/12/2019 |
RESIDUALS MANAGEMENT |
REPAIR |
06-88/5 |
07/02/2019 |
TEMPLIN ENGINEERING |
ALTERATION |
06-19/21.07 |
07/09/2019 |
D & V |
REPAIR |
06-34/2.04 |
07/23/2019 |
BIGGS ENGINEERING |
ALTERATION |
06-16/51.14 |
07/09/2019 |
BOB RUTAN |
REPAIR |
06-71.02/14 |
07/26/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-30/26.01 |
07/09/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-60/57.05 |
07/09/2019 |
KOLLMER |
REPAIR |
06-25/14.07 |
07/17/2019 |
JOHN KEARNEY |
ALTERATION |
06-97.01/12.06 |
07/16/2019 |
ROBERT RUTAN |
REPAIR |
06-36/8.14 |
07/16/2019 |
THE PUMPER |
REPAIR |
06-71/9.03 |
07/16/2019 |
TRI COUNTY |
REPAIR |
06-10/11 |
07/19/2019 |
BAYER RISSE |
ALTERATION |
06-30/24 |
07/19/2019 |
TED BAYER |
ALTERATION |
06-88/17.06 |
07/26/2019 |
D&V CONSTRUCTION |
REPAIR |
06-30/13.20 |
07/26/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
06-87.03/19 |
07/30/2019 |
KURT HOFFMAN |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
07-26/21 |
01/15/2019 |
DOUG FINE |
ALTERATION |
07-57/3.01 |
01/08/2019 |
DYKSTRA WALKER |
NEW |
07-43/21.02 |
01/03/2019 |
STEPHEN PARKER |
ALTERATION |
07-43.01/11.13 |
01/04/2019 |
MARTINS EXCAVATING |
REPAIR |
07-19/8.02 |
02/04/2019 |
BAYER RISSE ENGINEERING |
ALTERATION |
07-59/27 |
02/08/2019 |
BAYER RISSE |
ALTERATION |
07-30/44.02 |
02/14/2019 |
DOUG FINE |
ALTERATION |
07-31/6.19 |
03/18/2019 |
DANIEL J HOLZLI EXCAVATING |
REPAIR |
07-26.02/5 |
04/08/2019 |
DOUG FINE |
ALTERATION |
07-25/18.05 |
04/04/2019 |
JOHN MARTIN |
REPAIR |
07-12/10 |
05/10/2019 |
DOUG FINE |
ALTERATION |
07-26.02/4 |
05/02/2019 |
SJR EXCAVATION |
REPAIR |
07-56/18.03 |
05/09/2019 |
JEFF CONOVER |
REPAIR |
07-13/8 |
06/25/2019 |
BAYER-RISSE |
REDESIGN |
07-58/4 |
06/05/2019 |
BAYER-RISSE |
ALTERATION |
07-44/8.01 |
06/28/2019 |
BAYER RISSE |
ALTERATION |
07-44/6.04 |
06/27/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
07-43/12.02 |
07/18/2019 |
E&LP |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
08-8/10.10 |
01/24/2019 |
COUNTRY CLASSICS |
NEW |
08-24/11.10 |
01/09/2019 |
BEACHSTONE SEPTIC |
REPAIR |
08-41/8 |
03/25/2019 |
PARKER ENGINEERING |
ALTERATION |
08-8/10.06 |
03/11/2019 |
GOLDENBAUM BAILL |
NEW |
08-23/13.01 |
03/20/2019 |
D'AMICO ENGINEERING |
ALTERATION |
08-25/3.01 |
03/14/2019 |
KURT HOFFMAN |
ALTERATION |
08-14.01/2 |
03/28/2019 |
MICHAEL MESSICK PLUMBING |
REPAIR |
08-36/7.07 |
04/08/2019 |
WILLIAM MENDICINO CONSTRUCTION |
ALTERATION |
08-20/6.01 |
04/01/2019 |
JJ & B |
REPAIR |
08-14.01/2 |
04/09/2019 |
JOHN P. MARTIN EXCAVATING |
REPAIR |
08-18/9 |
05/06/2019 |
CHARLIE TIEDEMAN |
ALTERATION |
08-14.02/18 |
05/30/2019 |
KURT HOFFMAN |
ALTERATION |
08-25/1.01 |
05/29/2019 |
LUTZKY |
REPAIR |
08-16/8.11 |
06/06/2019 |
DOUG FINE ENGINEERING |
ALTERATION |
08-27.01/22 |
06/25/2019 |
PARKER ENGINEERING |
ALTERATION |
08-41/36 |
06/03/2019 |
GOLDENBAUM BAILL ENGINEERING |
ALTERATION |
08-40.02/6 |
06/07/2019 |
E & LP |
ALTERATION |
08-41/19.02 |
06/10/2019 |
BAYER RISSE |
ALTERATION |
08-26/2 |
06/17/2019 |
E & LP |
ALTERATION |
08-33/10 |
06/12/2019 |
LUSTER EXCAVATING |
REPAIR |
08-21/19.05 |
07/09/2019 |
JJ & B |
REPAIR |
08-21/12.02 |
07/26/2019 |
LUSTER |
REPAIR |
08-24/1.02 |
07/29/2019 |
BAYER RISSE |
ALTERATION |
08-40.01/30 |
07/29/2019 |
BAYER RISSE |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
TYPE OF
DESIGN |
ENGINEERING FIRM
OR REPAIRER |
10-37/26 |
02/22/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
10-27/8 |
02/13/2019 |
KURT HOFFMAN |
ALTERATION |
10-24/24 |
02/21/2019 |
DOUG FINE |
ALTERATION |
10-37/15 |
04/08/2019 |
KURT HOFFMAN |
ALTERATION |
10-5/9 |
04/26/2019 |
HOFFMAN |
ALTERATION |
10-16/36.07 |
05/10/2019 |
BAYER RISSE |
ALTERATION |
10-24/27.17 |
05/09/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
10-36/45.02 |
05/30/2019 |
BOB RUTAN |
REPAIR |
10-10/8.01 |
06/25/2019 |
E & LP |
ALTERATION |
10-37/41 |
06/24/2019 |
JJ & B SERVICES |
REPAIR |
10-10/5.08 |
06/28/2019 |
BEACHSTONE |
REPAIR |
10-10/5.08 |
06/28/2019 |
D & V CONSTRUCTION |
REPAIR |
10-23/1 |
07/19/2019 |
KURT HOFFMAN |
ALTERATION |
10-29/13 |
07/23/2019 |
KDP DEVELOPERS |
ALTERATION |
10-18/11 |
07/16/2019 |
ROBERT RUTAN |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
11-17/14.01 |
03/28/2018 |
D & V |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
TYPE OF
DESIGN |
ENGINEERING FIRM
OR REPAIRER |
12-9/28 |
01/03/2019 |
E & LP |
ALTERATION |
12-13/17 |
02/08/2019 |
ERICA BUSCH |
ALTERATION |
12-14/2.01 |
02/15/2019 |
BEACHSTONE |
REPAIR |
12-3/1.01 |
04/09/2019 |
ERICA BUSCH |
ALTERATION |
12-18/2 |
04/01/2019 |
LITTLE PINE |
REPAIR |
12-4/6.21 |
04/18/2019 |
TRI COUNTY SEPTIC |
REPAIR |
12-12/2 |
04/25/2019 |
TODD JOBSON |
REPAIR |
12-11/4 |
06/26/2019 |
E & LP |
ALTERATION |
12-10/16 |
06/24/2019 |
CASTLE SEPTIC |
REPAIR |
12-11/6 |
07/08/2019 |
WAYNE INGRAM |
ALTERATION |
12-19/5 |
07/18/2019 |
E&LP |
ALTERATION |
12-13/12 |
07/10/2019 |
TOBY BARKMAN EXCAVATING |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
13-15/10 |
02/21/2019 |
LITTLE PINE |
REPAIR |
13-1/10 |
03/11/2019 |
LIL PINE |
REPAIR |
13-21/2.20 |
04/10/2019 |
CASTLE SEPTIC |
REPAIR |
13-25/7.2 |
04/22/2019 |
CASTLE SEPTIC |
REPAIR |
13-14/7 |
05/29/2019 |
E & LP |
ALTERATION |
13-1/7 |
05/14/2019 |
ERICA BUSCH |
ALTERATION |
13-2/13 |
05/28/2019 |
LITTLE PINE |
REPAIR |
13-26.02/6 |
06/18/2019 |
LITTLE PINE |
REPAIR |
13-17/3 |
07/25/2019 |
CAREAGA |
ALTERATION |
13-3/5 |
07/29/2019 |
WAYNE INGRAM |
ALTERATION |
13-1/12 |
07/31/2019 |
E & LP |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
14-2.01/36 |
01/30/2019 |
E & LP |
ALTERATION |
14-2/20 |
03/13/2019 |
HERCULES SEPTIC |
REPAIR |
14-2/4.06 |
05/29/2019 |
HOFFMAN |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
15-3/116 |
01/22/2019 |
KURT HOFFMAN |
ALTERATION |
15-3/19 |
02/11/2019 |
KDP DEVELOPERS |
ALTERATION |
15-25/29.01 |
02/15/2019 |
LUSTER EXCAVATING |
REPAIR |
15-3/38 |
02/08/2019 |
CASTLE SEPTIC |
REPAIR |
15-5/4.02 |
02/27/2019 |
KOLLMER |
REPAIR |
15-21/42 |
02/27/2019 |
CASTLE |
REPAIR |
15-16.02/24 |
03/07/2019 |
ERICA BUSCH |
ALTERATION |
15-22/15.01 |
04/04/2019 |
DOUG FINE |
ALTERATION |
15-25/79 |
04/09/2019 |
VAN CLEEF |
ALTERATION |
15-17/4 |
04/29/2019 |
E & LP |
ALTERATION |
15-21/30.04 |
04/18/2019 |
WAYNE INGRAM |
ALTERATION |
15-9/7.01 |
05/01/2019 |
CASTLE SEPTIC |
REPAIR |
15-13/32 |
05/23/2019 |
E & LP |
ALTERATION |
15-14/7 |
05/28/2019 |
VAN CLEEF |
ALTERATION |
15-1/5.04 |
06/05/2019 |
BAYER RISSE ENGINEERING |
ALTERATION |
15-3/29 |
06/11/2019 |
KURT HOFFMAN |
ALTERATION |
15-5/102 |
06/11/2019 |
KURT HOFFMAN |
ALTERATION |
15-9/1.03 |
07/23/2019 |
STEVE PARKER |
ALTERATION |
15-16/33 |
07/17/2019 |
KURT HOFFMAN |
ALTERATION |
15-9/8.04 |
07/16/2019 |
WILLEVER |
REPAIR |
15-25.01/64.03 |
07/30/2019 |
G GLEODE |
ALTERATION |
15-9/28 |
07/25/2019 |
BEACHSTONE |
REPAIR |
15-11.03/10 |
07/30/2019 |
KURT HOFFMAN |
ALTERATION |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
16-1/1 |
01/23/2019 |
KURT HOFFMAN |
ALTERATION |
16-5/5 |
01/29/2019 |
BAYER RISSE |
REDESIGN |
16-26/13.01 |
02/15/2019 |
KURT HOFFMAN |
ALTERATION |
16-25/7.15 |
02/08/2019 |
KURT HOFFMAN |
REDESIGN |
16-26/14 |
02/04/2019 |
BAYER RISSE |
ALTERATION |
16-33/14.07 |
02/15/2019 |
DOUG FINE |
ALTERATION |
16-6/7.01 |
03/18/2019 |
GOLDENBAUM BAILL |
NEW |
16-14/8 |
03/25/2019 |
E & LP |
ALTERATION |
16-9/25.06 |
04/10/2019 |
JAMES MANTZ |
ALTERATION |
16-23/9 |
04/22/2019 |
DOUG FINE |
ALTERATION |
16-32/11.09 |
04/16/2019 |
BAYER RISSE |
REDESIGN |
16-32/11.08 |
04/16/2019 |
BAYER RISSE |
REDESIGN |
16-32/11.07 |
04/16/2019 |
BAYER RISSE |
REDESIGN |
16-32/11.06 |
04/16/2019 |
BAYER RISSE |
REDESIGN |
16-32/11.02 |
04/16/2019 |
BAYER RISSE |
REDESIGN |
16-25/7 |
04/08/2019 |
BAYER RISSE |
NEW |
16-1.02/5.17 |
04/05/2019 |
CASTLE SEPTIC |
REPAIR |
16-1/3.08 |
04/22/2019 |
CASTLE SEPTIC |
REPAIR |
16-51/13 |
04/30/2019 |
BRINKS TANK & ENVIRONMENTAL |
REPAIR |
16-29/18 |
05/13/2019 |
DOUG FINE |
ALTERATION |
16-24/2.01 |
05/16/2019 |
DELWARE VALLEY SEPTIC |
REPAIR |
16-22/15 |
06/05/2019 |
E&LP |
ALTERATION |
16-22/16.02 |
06/05/2019 |
HOFFMAN |
REDESIGN |
16-18/7.01 |
06/11/2019 |
HOFFMAN |
ALTERATION |
16-34/4.01 |
06/17/2019 |
D&V CONSTRUCTION |
REPAIR |
16-23/2 |
06/28/2019 |
KURT HOFFMAN |
ALTERATION |
16-1.02/3.13 |
07/17/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
16-40/18 |
07/02/2019 |
BAYER RISSE |
ALTERATION |
16-33/8.07 |
07/16/2019 |
MESSICK PLUMBING |
REPAIR |
16-7/5.02 |
07/23/2019 |
KURT HOFFMAN |
ALTERATION |
16-22/16.09 |
07/31/2019 |
KURT HOFFMAN |
REDESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
19-38/109 |
01/17/2019 |
KURT HOFFMAN |
ALTERATION |
19-37/18 |
01/11/2019 |
BAYER-RISSE |
ALTERATION |
19-60/30.01 |
01/17/2019 |
DEL VAL SEPTIC |
REPAIR |
19-37/18 |
01/25/2019 |
BAYER RISSE |
REDESIGN |
19-12/8 |
02/20/2019 |
E & LP |
REDESIGN |
19-35/75.03 |
02/26/2019 |
BAYER RISSE |
ALTERATION |
19-38/61 |
03/25/2019 |
BEACHSTONE SEPTIC |
REPAIR |
19-40/15 |
03/14/2019 |
CAREAGA ENGINEERING |
ALTERATION |
19-35/1 |
03/26/2019 |
BIGGS |
REDESIGN |
19-35/91.14 |
04/09/2019 |
KURT HOFFMAN |
ALTERATION |
19-61/13 |
04/18/2019 |
KURT HOFFMAN |
ALTERATION |
19-24/86 |
04/01/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
19-22/6 |
04/30/2019 |
TRI COUNTY |
REPAIR |
19-38/1.02 |
05/06/2019 |
G GLOEDE |
ALTERATION |
19-73/27 |
05/01/2019 |
D & V CONSTRUCTION |
REPAIR |
19-29/20 |
05/10/2019 |
KURT HOFFMAN |
ALTERATION |
19-49/50.03 |
05/13/2019 |
BAYER-RISSE |
REPAIR |
19-12/10.05 |
05/20/2019 |
J J & B SERVICES |
REPAIR |
19-69/52.03 |
05/30/2019 |
D & V |
REPAIR |
19-49/50.04 |
06/13/2019 |
KURT HOFFMAN |
NEW |
19-35/17 |
06/26/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
19-50/4.02 |
06/24/2019 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
19-35/74.01 |
07/30/2019 |
TEMPLIN |
ALTERATION |
19-64/5 |
07/17/2019 |
KURT HOFFMAN |
REDESIGN |
19-61/39 |
07/19/2019 |
KURT HOFFMAN |
ALTERATION |
19-66/3.03 |
07/23/2019 |
TBD |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
21-63/37.10 |
01/15/2019 |
GOLDENBAUM BIALL |
REDESIGN |
21-63/37.09 |
01/15/2019 |
GOLDENBAUM BIALL |
REDESIGN |
21-73.04/10 |
01/15/2019 |
KURT HOFFMAN |
ALTERATION |
21-86/20 |
01/22/2019 |
E & LP |
ALTERATION |
21-44/55 |
01/22/2019 |
E & LP |
ALTERATION |
21-7.01/12 |
01/07/2019 |
DOUG FINE |
ALTERATION |
21-77.13/12 |
01/11/2019 |
BAYER RISSE |
ALTERATION |
21-4/5.06 |
01/10/2019 |
SALVATORI'S |
REPAIR |
21-59/28 |
02/11/2019 |
E&LP |
ALTERATION |
21-76.01/27 |
02/20/2019 |
ERICA BUSCH |
ALTERATION |
21-63/42 |
02/04/2019 |
BAYER RISSE |
ALTERATION |
21-50/5.01 |
02/15/2019 |
E & LP |
ALTERATION |
21-77.13/8 |
02/05/2019 |
BAYER RISSE |
ALTERATION |
21-80.15/6 |
02/19/2019 |
HOCK EXCAVATING |
REPAIR |
21-6.16/21 |
02/25/2019 |
BOB RUTAN |
REPAIR |
21-84.01/14 |
02/26/2019 |
BAYER RISSE |
ALTERATION |
21-15/18 |
02/25/2019 |
RANCH HOLDINGS, LLC |
REPAIR |
21-11/1.10 |
03/05/2019 |
CLASSIC SEPTIC INSPECTIONS |
HOME INSPECTION REPORTS |
21-79/18.27 |
03/01/2019 |
JAMES MANTZ |
NEW |
21-11/1.10 |
03/05/2019 |
KURT HOFFMAN |
ALTERATION |
21-79/18.31 |
03/01/2019 |
JAMES MANTZ |
NEW |
21-80/13.01 |
03/15/2019 |
DOUG FINE |
NEW |
21-16/11 |
03/13/2019 |
JJ & B |
REPAIR |
21-15/83 |
03/25/2019 |
KURT HOFFMAN |
ALTERATION |
21-24/14 |
03/01/2019 |
E & LP |
ALTERATION |
21-15/21.12 |
03/08/2019 |
RANCH HOLDINGS LLC |
REPAIR |
21-79.07/1 |
03/14/2019 |
BAYER-RISSE ENGINEERING |
ALTERATION |
21-6.15/27 |
03/21/2019 |
HERCULES SEPTIC |
REPAIR |
21-79.09/24 |
03/15/2019 |
JJ & B |
REPAIR |
21-73.06/10 |
03/21/2019 |
CASTLE SEPTIC |
REPAIR |
21-41/64 |
03/22/2019 |
JEFF CONOVER |
REPAIR |
21-12/6 |
03/28/2019 |
LIL PINE |
REPAIR |
21-63/38.01 |
04/09/2019 |
KURT HOFFMAN ENGINEERING |
NEW |
21-44/67 |
04/11/2019 |
DAN HOLZLI |
REPAIR |
21-40.04/37 |
04/22/2019 |
GOLDENBAUM BAILL |
REDESIGN |
21-99/32 |
04/12/2019 |
CASTLE SEPTIC |
REPAIR |
21-25/67 |
04/16/2019 |
RICH METZ |
REPAIR |
21-5/17.10 |
04/15/2019 |
LAWSON EXCAVATING |
REPAIR |
21-24/29.03 |
04/15/2019 |
BEACHSTONE SEPTIC |
REPAIR |
21-73.01/5 |
04/25/2019 |
BAYER-RISSE |
ALTERATION |
21-6.10/2 |
04/18/2019 |
BOB RUTAN |
REPAIR |
21-3/8.04 |
04/22/2019 |
TRI-COUNTY |
REPAIR |
21-63.01/2.09 |
04/22/2019 |
MICHAEL MESSICK |
REPAIR |
21-6/8.18 |
04/24/2019 |
CASTLE SEPTIC |
REPAIR |
21-79/18.25 |
04/24/2019 |
NJ SEPTIC MANGEMENT |
REPAIR |
21-4/7 |
04/24/2019 |
MICHAEL CHABRA CONSTRUCTION |
REPAIR |
21-25/64 |
04/30/2019 |
D&V CONSTRUCTIN |
REPAIR |
21-79/18.28 |
05/03/2019 |
JAMES MANTZ |
NEW |
21-79/18.29 |
05/03/2019 |
JAMES MANTZ |
NEW |
21-79/18.30 |
05/03/2019 |
JAMES MANTZ |
NEW |
21-2/2 |
05/21/2019 |
FREY ENGINEERING |
ALTERATION |
21-73/54 |
05/09/2019 |
HOFFMAN |
ALTERATION |
21-44/1 |
05/02/2019 |
KEN LANGE |
REPAIR |
21-77.09/7 |
05/10/2019 |
JJ&B |
REPAIR |
21-26/24 |
05/20/2019 |
DOUG FINE |
ALTERATION |
21-60/3 |
05/16/2019 |
BEACHSTONE |
REPAIR |
21-15.05/11 |
05/13/2019 |
RICK BEAVERS |
REPAIR |
21-6.1/7 |
05/16/2019 |
LAWSON EXCAVATING |
REPAIR |
21-84.01/3 |
05/22/2019 |
DAN HOLZLI |
REPAIR |
21-6.16/28 |
05/30/2019 |
ERICA BUSCH |
ALTERATION |
21-73/19.02 |
05/20/2019 |
CAPPIELLO CONSTRUCTION, INC. |
REPAIR |
21-76/18 |
05/20/2019 |
SELF |
REPAIR |
21-11/4.03 |
05/23/2019 |
TRI-COUNTY |
REPAIR |
21-63/40 |
05/28/2019 |
TOWNSHIP OF RARITAN DPW |
REPAIR |
21-63/41 |
05/28/2019 |
TOWNSHIP OF RARITAN DPW |
REPAIR |
21-60/40.05 |
05/30/2019 |
CASTLE SEPTIC |
REPAIR |
21-75.03/12 |
06/12/2019 |
PARKER ENGINEERING |
ALTERATION |
21-40.04/41 |
06/12/2019 |
BAYER RISSE |
REDESIGN |
21-6.10/13 |
06/11/2019 |
KURT HOFFMAN |
ALTERATION |
21-60/40.08 |
06/12/2019 |
THE PUMPER |
REPAIR |
21-72.32/3 |
06/12/2019 |
DOBY & SON |
REPAIR |
21-6.18/7 |
06/14/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-83/3 |
06/18/2019 |
PARKER ENGINEERING |
ALTERATION |
21-63.03/4 |
06/14/2019 |
HUNTERDON EXCAVATING |
REPAIR |
21-25/3.08 |
06/28/2019 |
DOUG FINE |
ALTERATION |
21-59/21.13 |
06/18/2019 |
RICK BEAVERS |
REPAIR |
21-77/4.12 |
06/20/2019 |
JJ & B SERVICES |
REPAIR |
21-72.27/3 |
06/24/2019 |
JJ & B SERVICES |
REPAIR |
21-77.13/14 |
06/27/2019 |
TRI COUNTY SEPTIC |
REPAIR |
21-15/34 |
07/12/2019 |
DOUG FINE |
ALTERATION |
21-85/31 |
07/09/2019 |
RICK BEAVERS |
REPAIR |
21-78.01/1.35 |
07/09/2019 |
DELAWARE VALLEY SEPTIC |
REPAIR |
21-3/8.11 |
07/09/2019 |
JJ & B |
REPAIR |
21-60/15 |
07/16/2019 |
BAYER RISSE |
ALTERATION |
21-7/29.03 |
07/16/2019 |
KURT HOFFMAN |
ALTERATION |
21-25/3.07 |
07/16/2019 |
JJ & B |
REPAIR |
21-6.10/21 |
07/16/2019 |
JJ & B |
REPAIR |
21-6.07/19 |
07/19/2019 |
BAYER RISSE |
ALTERATION |
21-59/4.07 |
07/19/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
21-42/9.02 |
07/19/2019 |
JESSE LAWSON |
REPAIR |
21-6.13/47 |
07/24/2019 |
DOUG FINE |
ALTERATION |
21-77.10/3 |
07/26/2019 |
JJ & B |
REPAIR |
21-7/1 |
07/26/2019 |
DOBY & SON |
REPAIR |
21-72.14/25 |
07/29/2019 |
THE PUMPER |
REPAIR |
21-81.04/12 |
07/29/2019 |
MICHAEL MESSICK |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
22-63/8.01 |
01/17/2019 |
KURT HOFFMAN |
ALTERATION |
22-50/32.03 |
01/17/2019 |
STEVE PARKER |
ALTERATION |
22-45.02/46 |
01/17/2019 |
JOHN KEARNEY |
ALTERATION |
22-2/6 |
01/11/2019 |
RICHARD PFAUTH & SON |
REPAIR |
22-94/4 |
01/16/2019 |
HUNTERDON EXCAVATING |
REPAIR |
22-53/2.15 |
01/29/2019 |
THE PUMPER |
REPAIR |
22-72/3.13 |
01/30/2019 |
JOHN MARTIN |
REPAIR |
22-42/9.04 |
02/28/2019 |
JAMES J. MANTZ, PE & LS |
NEW |
22-39/13 |
02/15/2019 |
PARKER ENGINEERING |
ALTERATION |
22-73/3.46 |
02/19/2019 |
STEVE PARKER |
ALTERATION |
22-51/59.01 |
02/28/2019 |
KURT HOFFMAN |
ALTERATION |
22-14/10.06 |
02/28/2019 |
STEVE PARKER |
ALTERATION |
22-39/21.01 |
02/28/2019 |
HOFFMAN |
ALTERATION |
22-30/19 |
02/28/2019 |
PARKER ENGINEERING |
ALTERATION |
22-73/42 |
02/11/2019 |
D&V |
REPAIR |
22-43/28 |
02/28/2019 |
KURT HOFFMAN |
ALTERATION |
22-46/24.08 |
02/05/2019 |
BOB RUTAN |
REPAIR |
22-64/8.20 |
02/12/2019 |
BOB RUTAN |
REPAIR |
22-64/18.13 |
02/27/2019 |
THE PUMPER |
REPAIR |
22-45.03/28 |
03/11/2019 |
D GULICK |
REPAIR |
22-64/27.13 |
03/11/2019 |
DEL VAL SEPTIC |
REPAIR |
22-45.02/47 |
04/22/2019 |
KURT HOFFMAN |
ALTERATION |
22-70/38.05 |
04/30/2019 |
D GULICK |
REPAIR |
22-46/10.30 |
04/18/2019 |
DOUG FINE |
ALTERATION |
22-46/11.03 |
04/01/2019 |
JJ & B |
REPAIR |
22-53/2.14 |
04/01/2019 |
HICKS SEPTIC |
REPAIR |
22-73/3.40 |
04/08/2019 |
TRI-COUNTY SEPTIC |
REPAIR |
22-70.01/17.11 |
04/24/2019 |
TRIPLE K EXCAVATING |
REPAIR |
22-66.01/19.55 |
04/10/2019 |
HUNTERDON EXCAVATING |
REPAIR |
22-38/25 |
04/10/2019 |
|
REPAIR |
22-47/2 |
04/12/2019 |
RJ JUROMSKI EXC |
REPAIR |
22-64/18.02 |
04/25/2019 |
HUNTERDON EXCAVATING |
REPAIR |
22-54/1.05 |
04/30/2019 |
TRI-COUNTY |
REPAIR |
22-66/19.25 |
05/16/2019 |
PARKER ENGINEERINIG |
ALTERATION |
22-51/29 |
05/06/2019 |
DOUG FINE |
ALTERATION |
22-21/9 |
05/08/2019 |
DOUG FINE |
ALTERATION |
22-67/28 |
05/17/2019 |
BAYER-RISSE |
ALTERATION |
22-72.01/34.12 |
05/01/2019 |
RICK BEAVERS |
REPAIR |
22-51/51 |
05/09/2019 |
DOBY & SON |
REPAIR |
22-45/71 |
05/10/2019 |
TRI COUNTY SEPTIC |
REPAIR |
22-69/1.11 |
05/17/2019 |
HERCULES |
REPAIR |
22-97/4.03 |
05/23/2019 |
CASTLE SEPTIC |
REPAIR |
22-64/8.22 |
05/28/2019 |
ROBERT RUTAN |
REPAIR |
22-46/25.07 |
05/30/2019 |
JJ & B |
REPAIR |
22-51/62 |
06/26/2019 |
KURT HOFFMAN |
ALTERATION |
22-66/19.19 |
06/24/2019 |
E & LP |
ALTERATION |
22-97/2.06 |
06/14/2019 |
NJ SEPTIC MANAGMENT |
REPAIR |
22-55/1.02 |
06/21/2019 |
DOUG FINE |
ALTERATION |
22-73/3.25 |
06/26/2019 |
DOUG FINE |
ALTERATION |
22-53/2.10 |
06/06/2019 |
THE PUMPER |
REPAIR |
22-72/36.07 |
06/12/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
22-53/8.02 |
06/17/2019 |
GARDEN STATE SEPTIC |
REPAIR |
22-53/2.08 |
07/23/2019 |
DOUG FINE |
ALTERATION |
22-70/38.17 |
07/12/2019 |
TOBY BARKMAN EXCAVATING |
REPAIR |
22-51.02/38 |
07/12/2019 |
JAMES MANTZ |
REDESIGN |
22-68/10.15 |
07/17/2019 |
WHERE OLD MEETS NEW |
REPAIR |
22-74/26.05 |
07/16/2019 |
ROBERT RUTAN |
REPAIR |
22-1.01/2.03 |
07/16/2019 |
THE PUMPER |
REPAIR |
22-48.01/26.29 |
07/19/2019 |
CEDAR RIDGE |
REPAIR |
22-54/2.15 |
07/19/2019 |
NJ SEPTIC MANAGEMENT |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
24-4/6.13 |
01/09/2019 |
LIKUS |
REPAIR |
24-47.02/3 |
01/04/2019 |
BIGGS |
ALTERATION |
24-10/6.04 |
01/07/2019 |
BAYER RISSE |
ALTERATION |
24-27/100 |
01/15/2019 |
PARKER ENGINEERING |
ALTERATION |
24-6/27.03 |
01/29/2019 |
THE PUMPER |
REPAIR |
24-6.02/24.12 |
01/29/2019 |
CASTLE SEPTIC |
REPAIR |
24-42/7 |
02/08/2019 |
PARKER ENGINEERING |
ALTERATION |
24-6.04/37.04 |
02/20/2019 |
STEVE PARKER |
REDESIGN |
24-27/34 |
02/15/2019 |
GS LIKUS |
REPAIR |
24-48/3.03 |
02/15/2019 |
GS LIKUS |
REPAIR |
24-30/4 |
03/06/2019 |
PARKER |
ALTERATION |
24-4/10.06 |
03/13/2019 |
TRI COUNTY |
REPAIR |
24-6.01/24.08 |
04/04/2019 |
TRI COUNTY |
REPAIR |
24-6.04/24.11 |
04/04/2019 |
THE PUMPER |
REPAIR |
24-11/23 |
04/05/2019 |
BAYER RISSE |
ALTERATION |
24-6.04/1.12 |
05/15/2019 |
JK HOFFMAN |
REPAIR |
24-13/3 |
05/09/2019 |
BARKMAN EXCAVATING |
REPAIR |
24-32/37.05 |
05/13/2019 |
BOB RUTAN |
REPAIR |
24-6.01/24.04 |
05/29/2019 |
PARKER ENGINEERING |
ALTERATION |
24-32/22.05 |
05/29/2019 |
E & LP |
ALTERATION |
24-27/28 |
05/30/2019 |
BOB RUTAN |
REPAIR |
24-11/5.01 |
06/19/2019 |
G GLOEDE |
ALTERATION |
24-7/20 |
06/06/2019 |
PARKER ENGINEERING |
ALTERATION |
24-38/16.11 |
06/06/2019 |
BEDMINSTER EXCAVATION |
REPAIR |
24-51/25 |
06/28/2019 |
KURT HOFFMAN |
ALTERATION |
24-14/34 |
06/27/2019 |
BEACHSTONE |
REPAIR |
24-14/31 |
07/08/2019 |
ERICA BUSCH |
ALTERATION |
24-27/71.01 |
07/16/2019 |
THE PUMPER |
REPAIR |
24-12/53 |
07/16/2019 |
KURT HOFFMAN |
ALTERATION |
24-32.01/1 |
07/19/2019 |
CASTLE SEPTIC |
REPAIR |
24-27/23 |
07/24/2019 |
PARKER ENGINEERING |
ALTERATION |
24-12/41 |
07/26/2019 |
KEN LANGE |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
25-1.09/8 |
01/11/2019 |
RICK BEAVERS |
REPAIR |
25-30/1.08 |
03/13/2019 |
BEACHSTONE SEPTIC |
REPAIR |
25-28/19.06 |
03/22/2019 |
KURT HOFFMAN |
REPAIR |
25-28/19.03 |
03/28/2019 |
TRI COUNTY |
REPAIR |
25-22/33.02 |
04/10/2019 |
STATEWIDE ENVIRONMENTAL |
REPAIR |
25-1.05/20 |
04/24/2019 |
D&V CONSTRUCTION |
ALTERATION |
25-22/31.12 |
04/24/2019 |
RICK BEAVERS |
REPAIR |
25-27/8 |
05/28/2019 |
KURT HOFFMAN ENGINEERING |
ALTERATION |
25-21.02/29.25 |
05/03/2019 |
BAYER-RISSE |
ALTERATION |
25-22/5 |
05/29/2019 |
BAYERÂ RISSE |
REDESIGN |
25-22/5 |
05/24/2019 |
VA SPATZ & SONS |
REPAIR |
25-17/4.13 |
06/06/2019 |
KENNY LANG |
REPAIR |
25-16.01/4.29 |
06/14/2019 |
TRI COUNTY |
REPAIR |
25-30/6.02 |
06/28/2019 |
E&LP |
ALTERATION |
25-17/11 |
07/29/2019 |
D & V |
REPAIR |
25-15/1.04 |
07/19/2019 |
CASTLE SEPTIC |
REPAIR |
25-5/1.03 |
07/26/2019 |
BEDMINSTER EXCAVATING |
REPAIR |
25-11/4.02 |
07/26/2019 |
CASTLE SEPTIC |
REPAIR |
- |
- |
- |
- |
TO TOP
|
REFERENCE
NUMBER |
DATE
APPROVED |
ENGINEERING FIRM
OR REPAIRER |
TYPE OF
DESIGN |
26-5/19 |
01/02/2019 |
G BARKLEY |
ALTERATION |
26-13/2 |
02/08/2019 |
SEPTICS BY PATTERSON |
ALTERATION |
26-17/26 |
02/08/2019 |
G BARKLEY |
ALTERATION |
26-10/2 |
03/15/2019 |
BAYER RISSE |
ALTERATION |
26-8/62 |
04/04/2019 |
CASTLE SEPTIC |
REPAIR |
26-23/1 |
04/05/2019 |
J A NEARY |
REPAIR |
26-23/15 |
05/13/2019 |
DOUG FINE |
ALTERATION |
26-30/15.02 |
06/06/2019 |
HUNTERDON HORIZONS |
REPAIR |
26-21/9 |
07/15/2019 |
GOLDENBAUM BAILL |
ALTERATION |
26-14.02/11 |
07/30/2019 |
DOUG FINE |
ALTERATION |
- |
- |
- |
- |
TO TOP
|